Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Limestone, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Limestone, TN?

Select your specific project to find the pro for you.

TRUSTED BY LIMESTONE, TN HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon43
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Limestone

Avatar for East Tenn Pools & Covers, LLC
East Tenn Pools & Covers, LLC
5.0(
7
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Limestone, TN and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"I looked hard and far to find a responsible professional pool and spa maintenance Co. I found one or two, but they didnâ t return calls, werenâ t willing to come to my property for a price quote and preliminary meeting until I found ETP&C Ltd. These guys Hayden and his partner are professional and dedicated to building a five star client rating; and hey if you own a pool and spa, we know quality, we worked hard for our success and our toys and we deserve the best service possible ."
Response time1 day
Recommended by100%of homeowners
Above Ground Pool Installers TN
New to Angi
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Limestone, TN and surrounding areas

In business since 2020

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.\n

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,689
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Limestone, TN and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

A pool chiller will take anywhere from 12 to 14 hours to lower your pool's temperature by 1 to 15 degrees. Most people tend to run their coolers overnight, but larger pools in warm climates take longer to cool. Choosing a chiller with the right capacity can help speed up the process.

Pool light replacements are often more expensive compared to other pool parts, like pump motors, or standard light bulbs for indoor use. The reason for the higher cost is that pool lights are specially designed and made with parts meant to keep swimmers safe. The light fixture and surrounding parts protecting the bulb must be waterproof, tightly sealed, and resistant to extreme temperatures.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Before deciding to install a swimming pool in your yard, there are many factors to consider. Even if you still need to figure out the specifics with your pool installer, having an idea of what you'd like will help the initial consultation. Some topics to consider include:

  • Will you use salt water for your pool or traditional hose water?

  • How big of a pool do you want to install? How deep?

  • What special zoning laws do you need to follow for your area?

  • Do you want to keep it simple or add special features like underwater lighting and waterfalls?

No, shock and chlorine are not the same thing, though they are related and both are used for pool maintenance. Regular chlorine, often in the form of tablets, is a sanitizer used for routine, day-to-day maintenance to keep a steady chlorine level. Pool shock, however, is a highly concentrated dose of chlorine used periodically for a more intense cleaning. It rapidly raises chlorine levels to fix issues like cloudy water or algae growth and also eliminates chloramines, which are byproducts of regular chlorination. Because their purposes and concentrations differ, they are not interchangeable, and proper pool care typically requires using both.

The Limestone, TN homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.