Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Brunswick, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Brunswick, TN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Brunswick

Avatar for Razo's Landscaping Service LLC
Razo's Landscaping Service LLC
5.0(
5
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Brunswick, TN and surrounding areas

Approved

Free estimates

Warranties offered

Credit card accepted

Vibrant flowers, blooming bushes, manicured lawns, and high hedges, top-notch landscaping elevates an outdoor space. Whether your landscaping firm works on residential, commercial, or public spaces, your clients are trusting you to create beautiful lawns and gardens that inspire them to stop and smell the roses.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Climer Striping
Climer Striping
5.0(
2
)
Asphalt Sealing

Serving Brunswick, TN and surrounding areas

Approved

In business since 2017

Free estimates

Credit card accepted

"Has great customer service. Did a fantastic job sealing my driveway and would recommend this company to anyone that needs any kind of asphalt maintenance. A very professional company."
My work
My work
My work
My work
My work

+7

Response time12 hrs
12 neighbors recently requested a quote
Recommended by50%of homeowners
...
Showing 1-10 of 120
Asphalt Driveways questions, answered by experts

Depending on project size, typically 1 to 3 days, including preparation and installation.

In most cases, you don’t need a permit to repave your driveway, although some exceptions exist. If you’re widening your driveway and plan on widening the apron as well, you’ll usually need a permit from the Department of Transportation in your area. This permit costs between $50 and $300 in most cases. Most municipalities will also require a certified and insured contractor do the work relating to the apron and curb cut. You can contact your building department or ask your paving company if you need a permit. Your driveway professional will usually pull the permit for you.

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

The Brunswick, TN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.