Top-rated asphalt driveway pros.

Best asphalt driveway pros near Gilt Edge, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Gilt Edge, TN?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Gilt Edge - Updated Nov 2026

Avatar for Climer Striping
Climer Striping
5.0(
2
)
Asphalt Sealing

Serving Gilt Edge, TN and surrounding areas

Approved

In business since 2017

Free estimates

Credit card accepted

"Has great customer service. Did a fantastic job sealing my driveway and would recommend this company to anyone that needs any kind of asphalt maintenance. A very professional company."
My work
My work
My work
My work
My work

+7

Response time12 hrs
3 neighbors recently requested a quote
Recommended by50%of homeowners
Avatar for Nuevo Construction
Nuevo Construction
5.0(
4
)
Interlocking Pavers for Driveways & Floors - Install

Serving Gilt Edge, TN and surrounding areas

Approved

In business since 2008

Free estimates

Credit card accepted

At our company, we take immense pride in our wealth of experience, expertise, and the exceptional customer service we offer to meet our clients' needs. Our mission is to consistently deliver outstanding design work and drawings, from project initiation to completion. We place great emphasis on understanding and exceeding our customers' needs and expectations, ensuring that every interaction is conducted with the utmost professionalism. Our reputation is founded on top-notch service and quality, irrespective of the size of the project. Get in touch with us today!

Avatar for A1 Concrete
A1 Concrete
4.8(
2
)
Concrete Driveways - Install

Serving Gilt Edge, TN and surrounding areas

In business since 2013

Free estimates

Emergency services offered

"A1 concrete did an amazing job on my driveway. They were fast and the quality and price were amazing. I would definitely recommend them to anyone who needs a driveway installed."
Driveway
Driveway
Driveway piece
Concrete Driveway
Driveway piece

+13

Response time4 hrs
Response rate88%
Recommended by100%of homeowners
...
Showing 1-10 of 77
Asphalt Driveways FAQs, answered by experts

Think of the street as a way to capture all the elements on either side of the road, including the road—a street encompasses the homes or other buildings, the trees, and the road of a given area as defined by the beginning and end of the street on a map. A roadway, however, is the component of the street where cars travel.

Depending on project size, typically 1 to 3 days, including preparation and installation.

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Gilt Edge, TN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.