Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Gilt Edge, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Gilt Edge, TN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Gilt Edge

Avatar for Climer Striping
Climer Striping
5.0(
2
)
Asphalt Sealing

Serving Gilt Edge, TN and surrounding areas

Approved

In business since 2017

Free estimates

Credit card accepted

"Has great customer service. Did a fantastic job sealing my driveway and would recommend this company to anyone that needs any kind of asphalt maintenance. A very professional company."
My work
My work
My work
My work
My work

+7

Response time12 hrs
6 neighbors recently requested a quote
Recommended by50%of homeowners
Avatar for A1 Concrete
A1 Concrete
4.8(
2
)
Concrete Driveways - Install

Serving Gilt Edge, TN and surrounding areas

In business since 2013

Free estimates

Emergency services offered

"A1 concrete did an amazing job on my driveway. They were fast and the quality and price were amazing. I would definitely recommend them to anyone who needs a driveway installed."
Driveway
Driveway
Driveway piece
Concrete Driveway
Driveway piece

+13

Response time4 hrs
Response rate88%
Recommended by100%of homeowners
...
Showing 1-10 of 74
Asphalt Driveways questions, answered by experts

Asphalt edging secures the sides of your driveway to prevent crumbling and cracking over time. Most driveways have edges with a 45-degree grading. This helps transfer some of the stress from the asphalt to the ground underneath. If your driveway doesn’t have proper edging, the pressure from your car may break down the edges over time.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

The Gilt Edge, TN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.