Top-rated driveway sealcoating pros.

Get matched with top driveway sealcoating pros in Tea, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your driveway sealcoating project in Tea, SD?

Select your specific project to find the pro for you.

TRUSTED BY TEA, SD HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon48
    Verified driveway sealcoating reviews

Find Driveway sealcoating pros in Tea

Driveway Sealcoating questions, answered by experts

A good rule for all homeowners is to seal every driveway to protect it. Wait at least three months to seal an asphalt driveway and one month to seal a concrete driveway. You know it’s time to reseal your driveway when it shows obvious signs of wear and tear. It may appear as fading or discolored asphalt, small cracks, and oil stains. If you notice that one area of your driveway seems to dry slower than others, it’s time to reseal.

When hiring an asphalt paving contractor to install your driveway, ask as many questions up front as possible. Here are a few questions to ask a prospective driveway contractor:

  • How many years of experience do you have?

  • Are you licensed, bonded, and insured?

  • Do you have worker’s compensation?

  • Do you use subcontractors on your projects?

  • Do you clean up after the job is done?

  • Who is responsible for any damage to lawn or landscaping?

  • Do you provide a guarantee or warranty on your work?

  • Do you give free estimates?

  • What is the timeline for completion?

  • How do you handle change orders?

  • Can you provide at least three references?

  • Can I see some of the work you’ve done?

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

When comparing installation costs, asphalt is often less expensive upfront than concrete. Asphalt prices typically range from $7 to $15 per square foot, while concrete can range from $3 to $18 per square foot. However, long-term costs should also be considered. Concrete driveways generally last longer (up to twice as long) and require less maintenance, which can make them more affordable over their lifespan. While asphalt has a lower installation cost and is easier to repair, it requires more frequent maintenance, such as sealing, which can add up over time. Therefore, while concrete is more expensive initially, its durability may offset the cost in the long run.

A good asphalt maintenance schedule covers all the pitfalls that can happen to your asphalt. Just how often you should maintain your pavement will depend on the type of maintenance. Resealing your asphalt driveway should be done every three to five years. Cleaning is more of an annual task while repairing cracks and potholes comes in on an as-needed basis.

The Tea, SD homeowners’ guide to driveway sealcoating

From average costs to expert advice, get all the answers you need to get your job done.