Top-rated above ground pool installation pros.

Best above ground pool installation pros near Burke, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Burke, SD?

Select your specific project to find the pro for you.

Top-Rated Above ground pool installation pros in Burke - Updated Nov 2026

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,689
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Burke, SD and surrounding areas

In business since 1971

Credit card accepted

"AHS is ok. They cover repairs of most everything under the roof of your house. The companies that contract with them are not always the best. You call AHS with the issue, they send a fax to the repair company and give you the contact info. If they don't contact you within 24 hours, you call them. Sometimes they answer, sometimes they don't. When they arrive (usually three days or so later), they service the item. if it has issues within the 90 days, you call AHS again, they are sent out with no charge. If the serviceman decides the unit is unrepairable, AHS will allow you to choose a replacement from their listing (usually not as good as what you have) they will install and remove your old item, or give you wholesale amount to buy and install your own. Prices vary on what you want covered and what you want the copay to be, plus where you live. For me it is 49.99 per month with a 75.00 time of service order. You can have more than one item serviced at the same time under the same fee. If you have a SEAR product the repair guys are great. Not that wild about the other ones they send out. But it is a big savings compared to calling someone on your own. The cost of service is only the 75.00 copay."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Midwest Pool and Spa Services
5.0(
2
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Burke, SD and surrounding areas

In business since 2024

Free estimates

Offers commercial services

"Chris was very knowledgeable about the opening of my pool as well as balancing my hot tub. He explained everything in detail so I understood what he was doing. He was friendly and professional and I would highly recommend him for your pool and hot tub needs."
Response time1 day
Recommended by100%of homeowners
Install Above Ground Pools FAQs, answered by experts

A pool chiller will take anywhere from 12 to 14 hours to lower your pool's temperature by 1 to 15 degrees. Most people tend to run their coolers overnight, but larger pools in warm climates take longer to cool. Choosing a chiller with the right capacity can help speed up the process.

Home inspectors only check swimming pools if they have expertise in that area. During a standard home inspection, they focus on the house’s structure, roof, foundation, electrical, plumbing, and other components. If they examine your pool, they’ll check the pump and heater. If you want a thorough pool inspection, hire a pool inspection specialist.

Installation typically takes 4-8 weeks, including site preparation and liner installation.

Just like a traditional in-ground pool, semi-inground pools can be between three and eight feet deep. Lap pools, for example, are often an average of 4 feet deep, while a traditional pool may have both a shallow and deep end. The depth of your semi-inground pool depends on the liner you purchase, as well as how much excavation you plan to do before the installation.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Burke, SD homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.