Top-rated excavation pros.

Best excavation pros near Warrenton, OR

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Warrenton, OR?

Select your specific project to find the pro for you.

TRUSTED BY WARRENTON, OR HOMEOWNERS

  • Average homeowner rating star icon4.9
    Average homeowner rating
  • Verified reviews icon15
    Verified excavation services reviews

Top-Rated Excavation pros in Warrenton - Updated Nov 2026

Avatar for Green Hills Construction
Green Hills Construction
4.5(
38
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+1 more

Serving Warrenton, OR and surrounding areas

Approved

Super Service Award Winner

In business since 2000

Free estimates

Warranties offered

"The job was a complete remodel from floor to ceiling. We replaced tile and carpet with engineered hardwood, gutted and remodeled 2 bathrooms, new kitchen cabinets, countertops, backsplash and appliances. Updated plumbing and electrical, removed walls, scraped popcorn ceiling added can lighting and painted. The job also included all new solid wood doors throughout, and new trim and molding. I would recommend Green Hills Construction in a heartbeat! I was kept in the loop throughout and the end result is awesome."
pergola
pergola
stone work
stone work
deck

+20

Response time2 days
Response rate97%
21 neighbors recently requested a quote
Schwartz General Contracting, LLC
4.6(
22
)
Building Site - Preparation and Clearing - For BusinessExcavation - Major Grading or ReslopingExcavation - Major Grading or Resloping - For Business

Serving Warrenton, OR and surrounding areas

In business since 2019

Free estimates

Offers commercial services

"Nice guy. Hard worker. Charged less than initial bid. Did a great job. Was on time. Finished hour early so cost was less than original bid. He excavated property, got rid of blackberries, put all in neat piles for future burning."
Response time4 hrs
Recommended by89%of homeowners
Raymond A. Schwahn Construction
4.4(
20
)
Building Site - Preparation and ClearingExcavation - Major Grading or Resloping

Serving Warrenton, OR and surrounding areas

In business since 1991

Free estimates

Credit card accepted

"The project was demolition of an old swimming pool to code and filling it in with dirt. Ray is a hard-worker, never complained about the 100+ degree weather, reliable, finished the project in the amount of time proposed, gave a fair price and made my life easy. Project required extra (unforeseen) equipment and he actually split the extra cost with us instead of making us pay the full extra amount. Would use him again and recommend him."
Land clearing
Pole barn preperation
Storage shed demolition
House demolition and regraded lot
House demolition

+7

Response time2 hrs
Recommended by92%of homeowners
Showing 1-10 of 19
Excavating FAQs, answered by experts

Slab foundations are more affordable than crawl spaces because they require minimal excavation, as the slab sits directly on the ground or on footers that only sink a few feet into the ground. Crawl spaces require excavation of the entire footprint of the home to several feet below the surface. Not only does that mean higher labor costs, but more materials are necessary for the concrete foundation walls.

A crawl space can be as little as 42 inches below the grade of your house, but this is not always recommended in flood-prone areas. At a minimum, there must be at least 16 inches of clearance between the ground and the floor joists to access the space in an emergency.

There are several different factors that influence how long it takes to excavate. For a foundation, it could take anywhere from three days to three weeks. It can take even longer if you face weather-related delays or an inaccessible site that’s riddled with boulders and rough terrain. It may also take longer if you have clay soil, which is more difficult to dig.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

You do not have to dig footers for a deck as long as it meets local code and holds up to weather in your area. If you live somewhere that experiences high winds and earthquakes, you may need to dig for your deck posts. Deck blocks, post anchors with base plates, and helical pile systems are the three no-dig deck post options you can choose from if local code permits.

The Warrenton, OR homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.