Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Creswell, OR

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Creswell, OR?

Select your specific project to find the pro for you.

TRUSTED BY CRESWELL, OR HOMEOWNERS

  • Average homeowner rating star icon4
    Average homeowner rating
  • Verified reviews icon32
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Creswell

Avatar for Natco Development
Natco Development
4.7(
29
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Creswell, OR and surrounding areas

Approved

In business since 2001

Free estimates

Emergency services offered

"Excellent company! Professional, responsible, punctual, knowledgeable and a dream to work with. Brad answered all our questions during the bid process. He was very helpful in designing our project and was very responsive to all our concerns during the forming and pouring process. Our job was a huge project and Brad and Jessica were phenomenal at putting our minds to ease! This company does not stop until you are 100% satisfied with their work."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+25

Response time2 days
Response rate100%
Recommended by76%of homeowners
Avatar for West Excavation LLC
West Excavation LLC
5.0(
7
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Creswell, OR and surrounding areas

Approved

In business since 2023

Free estimates

Emergency services offered

"Nathan was professional and thorough. Completed everything in the bid on time and for the agreed upon price, which was very fair. Very good communication and follow through. We have a steep vineyard site that required extensive brush clearing and grading, along with a driveway that needed gravel replacement and resurfacing. We plan to use Nathan again for some annual maintenance of our site and can recommend him to others without reservation."
New driveway
Land clearing
After
Before
House Demolition

+1

Response time4 hrs
Response rate100%
2 neighbors recently requested a quote
Avatar for Elevated Landscape & Design
Elevated Landscape & Design
5.0(
6
)
Interlocking Pavers for Driveways & Floors - Install

Serving Creswell, OR and surrounding areas

Approved

In business since 2024

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumers needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on trust, confidence, and quality, regardless of how large or small the job.\n\n

Artificial Turf
Artificial Turf
Artificial Turf
Artificial Turf
Artificial Turf

+24

7 neighbors recently requested a quote
...
Showing 1-10 of 70
Asphalt Driveways questions, answered by experts

Depending on project size, typically 1 to 3 days, including preparation and installation.

An asphalt driveway should be at least 3 inches thick over a compacted gravel base. Areas with poor drainage should have a thicker stone base. To install a new asphalt driveway over an existing driveway, the new asphalt should be at least 2 inches thick and the existing driveway should be in relatively good condition.

A driveway's lifespan varies by material. Asphalt driveways typically last 15 to 30 years, while concrete driveways last longer, between 20 and 50 years. The longevity of any driveway is affected by factors like extreme temperatures, heavy traffic, and the quality of maintenance. Regular upkeep, such as filling cracks, resealing the surface, and ensuring proper drainage, can help extend its life. For gravel driveways, regrading to fill in uneven areas every year or two is recommended.

A driveway approach is the part of a driveway where the public road meets the private driveway. This section contains several key elements, including the driveway apron, the curb cut, and the end slope. Depending on the slope of the driveway, this area may also contain the trench drain.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Creswell, OR homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.