Install Above Ground Pools FAQs, answered by experts

Your contractor will need several days to several weeks as far as a timeline to install your semi-inground pool goes. Adapting an aboveground pool to be semi-inground by excavating and partially burying the liner, for example, will only take three to five days, while installing an in-ground pool with a poured concrete liner and building up the land around it will require several weeks. Keep in mind that the process of hiring a pool contractor and applying for permits can add several additional weeks to the total timeline.

Yes, pool designs can be customized to accommodate specific preferences, allowing for unique shapes, personalized tiling, special lighting features, water fixtures, and varying depths to create bespoke leisure experiences.

It's not a good idea to drain an aboveground pool into your yard since the pool water's chemicals can harm your plants and the surrounding ecosystem. Instead, it's best to drain the pool into an appropriate sewer so it can be processed at a water treatment plant. You might also be able to drain it into your storm drain, depending on your region. Check with your city to learn about any relevant regulations.

While you can install an above ground pool on most level surfaces, you’ll need sand to protect your liner from tearing. For example, rocks, plants, and twigs can take a toll on your liner. Adding sand will help level the pool even more. For additional support, you can also use angled foam or a foam pool cove.

It’s a good idea to wait at least 24 hours after opening your pool before you swim in it. Pool opening often involves shocking the water, and the chemical levels need to come down a bit before it’s safe to swim. You can continue testing your water pH and chlorine levels if you’re in a rush. It’s wise to wait until your chlorine levels drop to under four parts per million (ppm) and you have a water pH of between 7.2 and 7.8. You can artificially lower your water pH to speed up the process.