Install Above Ground Pools FAQs, answered by experts

Gunite pools are not exactly easy to maintain—but we wouldn't call them "high maintenance." It's one of the longest-lasting pool options, but its porous surface does require a lot of care. You’ll need to thoroughly clean the pool often to prevent stubborn algae growth, and the pool will require higher chemical levels to keep it clean. 

Aboveground pools take between one day to a few days to install, depending on the pool size and type. Your project may take longer if you’re planning to complete other projects simultaneously, like building a deck around the pool. If your land is hilly or rocky, you’ll also need to budget time for the land preparation. Aboveground pools need to be installed on a level surface.

The average pool loses one-eighth of an inch of water every day. However, how much your pool will lose depends on various factors, such as water temperature, climate, and weather. Warm water will evaporate more quickly than cold water, and pools in low-humidity climates will experience faster evaporation. However, this doesn’t mean you’ll need to constantly refill your pool.

The formula you’ll use to measure your pool will differ based on the shape of your pool. For a rectangular pool, you’ll use the following formula to find the size in gallons: length x width x depth x 7.5. If the depth changes from one end of your pool to the other, take the average by finding the depth at the deepest and most shallow points and dividing that number by two. Circular and oval pools require different, more complicated formulas, which can be found in this article.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.