Top-rated excavation pros.

Get matched with top excavation pros in Kiowa, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Kiowa, OK?

Select your specific project to find the pro for you.

Find Excavation pros in Kiowa

Avatar for Dumpster Dog
Dumpster Dog
5.0(
10
)
Building Site - Preparation and Clearing

Serving Kiowa, OK and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

"This is hands-down the best company Iâ  ve ever seen theyâ  re quick to respond. They do what they say theyâ  re going to do for the best price."
Junk Removal
Junk Removal
Junk Removal
Junk Removal
Junk Removal

+16

Response time10 hrs
40 neighbors recently requested a quote
Recommended by77%of homeowners
C-Mac Trucking LLC
New to Angi
Building Site - Preparation and ClearingExcavation - Major Grading or Resloping

Serving Kiowa, OK and surrounding areas

Approved

In business since 2012

Free estimates

Offers commercial services

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumers' needs. It is our mission to provide excellent workmanship, and complete customer satisfaction from start to completion of a project. In order to understand the needs, and expectations of our customers, we take great care to work, and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Response time7 hrs
Avatar for Panther Creek Land Solutions, LLC
Panther Creek Land Solutions, LLC
5.0(
6
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Kiowa, OK and surrounding areas

In business since 2015

Free estimates

Credit card accepted

"I hired Mike to put in a driveway and clear a 20x30 gravel site to park an RV on my land. He did a great job and went above and beyond when it came to making sure I was happy with the work being done. I would recommend Mike to anyone that needed some excavation work. He was very professional. Mike can be trusted. We will be using his service is again."
Stump bucket
Before we started
Big pile of cedars
Looks so much better
All clear

+2

Response time6 hrs
Response rate95%
Recommended by83%of homeowners
Showing 1-10 of 48
Excavating questions, answered by experts

Professional installers often include a deep layer of crushed gravel under permeable pavers to allow more runoff to soak through into the soil below. Many installations will include multiple layers of gravel, with coarser aggregate at the base and finer aggregate that sits on top of that bottom layer. Above the gravel, you’ll often find coarse sand that helps reduce paver shifting over time. Some permeable paver designs include a water collection system set into the gravel layer to route runoff to a safe area for disposal.

The best way to protect tree roots is to avoid the roots entirely by excavating outside the root radius of the tree. For nearby projects, it’s a good idea to construct a temporary retaining wall. But that’s not always possible, depending on the project and the root system. In these cases, consider using alternative equipment like an auger to tunnel under the ground.

Remember, tree roots can damage nearby cement foundations as they grow. If a tree is close enough to interfere with large excavations, it may be better to remove the tree than risk future problems.

No, a ditch isn’t a trench. A ditch is an open, relatively shallow channel that’s carved out of the ground and used for drainage purposes. In contrast, a trench is a deeper excavation that’s entirely underground. Trenches have many uses, including gas lines, sewage systems, and electrical wiring. Unlike trenches, ditches don’t get filled back in with dirt after they’re dug.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

The best method for digging a trench depends on the scope of the project. For a short, shallow trench (less than 2 feet deep) in light, soft soil, digging by hand may be sufficient. However, digging by hand is labor-intensive, so consider the effort required. A machine trencher is the better option for longer trenches (over 100 feet), deeper ones, or when dealing with difficult soil conditions, such as rocky or hard ground, or obstructions like tree roots. A machine can save significant time and energy in these situations.

The Kiowa, OK homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.