Top-rated paving pros.

Get matched with top paving pros in Geary, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Geary, OK?

Select your specific project to find the pro for you.

Find Paving pros in Geary

Avatar for No Kap Paving
No Kap Paving
4.2(
5
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+1 more

Serving Geary, OK and surrounding areas

In business since 2021

Free estimates

"The best work I’ve had done in all my 22 years! Would extremely recommend going to these young entrepreneurs! Don’t waste your money with a hit and miss company! Go to these guys and get the job done right the first time and every time you need them! Great company with a great mindset!"
Driveways - Asphalt Project
Driveways - Asphalt Project
Driveways - Asphalt Project
Driveways - Asphalt Project
Driveways - Asphalt Project

+42

Recommended by80%of homeowners
Avatar for Rolin Seal and Stripe
Rolin Seal and Stripe
4.8(
8
)
Asphalt Paving - Repair or Patch - For Business

Serving Geary, OK and surrounding areas

In business since 2014

Free estimates

Credit card accepted

"Rolin Seal and Stripe was very professional. Kept us informed about when temperature was correct. They arrived on time and did a great job. I recommend this asphalt company to others."
Before
Before
Before
Before
Before

+20

Response time2 days
Recommended by100%of homeowners
Showing 1-10 of 30
Paving Services questions, answered by experts

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The recommended minimum amount for a paver base is 4 inches. From there, it depends on the kind of traffic the pavers will see and the current soil conditions. Two inches of paver base won’t create the amount of stability and support that pavers need to remain securely in place over time.

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

The most common causes of sunken pavers are poor base preparation and insufficient compaction. The problem could also be how your pavers were installed. If the soil beneath your patio or walkway wasn't compacted, it will pull pavers down as it settles. Additionally, using bare soil instead of making a paver bed with compacted gravel and sand can cause sinking over time. To fix sunken pavers, consider recompacting the base and addressing any drainage or erosion issues in the area.

In most cases, you don’t need a permit to repave your driveway, although some exceptions exist. If you’re widening your driveway and plan on widening the apron as well, you’ll usually need a permit from the Department of Transportation in your area. This permit costs between $50 and $300 in most cases. Most municipalities will also require a certified and insured contractor do the work relating to the apron and curb cut. You can contact your building department or ask your paving company if you need a permit. Your driveway professional will usually pull the permit for you.

The Geary, OK homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.