Top-rated basement remodelers.

Get matched with top basement remodelers in Claremore, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Claremore, OK?

Select your specific project to find the pro for you.

Find Basement remodelers in Claremore

Dream Ready Construction, LLC
5.0(
12
)
Basement - Remodel

Serving Claremore, OK and surrounding areas

Approved

In business since 2020

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.\n

2 neighbors recently requested a quote
Recommended by27%of homeowners
Avatar for Dream Ready Construction
Dream Ready Construction
5.0(
7
)
Basement - Remodel

Serving Claremore, OK and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Credit card accepted

"Foundation Pros LLC came out and did a wonderful job on repairing the foundation to my home! The quality and price were excellent! I will call them again next time I need foundation work done. Thank you!"
Response time5 hrs
Response rate99%
42 neighbors recently requested a quote
Avatar for T&T Tile and Bath Remodeling
T&T Tile and Bath Remodeling
New to Angi
Basement - Remodel

Serving Claremore, OK and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

A 20 year Retired military Veteran owned company (named after my children) we specialize in total bathroom and kitchen remodeling, we offer flooring to include tile, carpet, epoxy, hardwood, laminate etc. \n You dream it we build it. \nOur moto “Customer first Mission driven” \n Licensed and Insured \n

From small to big
...
Showing 1-10 of 102
Basement Remodel questions, answered by experts

Permits may be required for major repairs, structural work, or electrical and plumbing restoration after a flood. Check with your local building department to determine permit requirements and associated fees for your flooded basement cleanup project. Obtaining the correct permits helps ensure work is done safely and up to code.

Living in a finished basement is acceptable, but only if the space has the proper points of egress and includes smoke and carbon monoxide (CO) detectors to ensure the safety of the occupants. A good way to ensure your finished basement is suitable for use as living space is to get the basement finishing project properly permitted.

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

Key trends include home gyms, theatre rooms, additional rooms (bedroom/office), and more, with personalized styles reflecting individual preferences.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Claremore, OK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.