Top-rated basement remodelers.

Get matched with top basement remodelers in Bixby, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Bixby, OK?

Select your specific project to find the pro for you.

Find Basement remodelers in Bixby

Dream Ready Construction, LLC
5.0(
12
)
Basement - Remodel

Serving Bixby, OK and surrounding areas

Approved

In business since 2020

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.\n

1 neighbors recently requested a quote
Recommended by27%of homeowners
Avatar for TLK Interiors
TLK Interiors
4.1(
27
)
Basement - Remodel

Serving Bixby, OK and surrounding areas

Approved

In business since 2010

Free estimates

Warranties offered

"The planning went well. The job took a little longer than expected. Most all the plans came out very well. I had some objections to some small areas of painting. I enjoyed working with Terri."
Modern Dining Room
Kitchen Reno...
Bathroom Reno...
Bathroom Reno...
Master Suite for HER....

+10

Response time2 hrs
Response rate86%
5 neighbors recently requested a quote
Avatar for Dream Ready Construction
Dream Ready Construction
5.0(
7
)
Basement - Remodel

Serving Bixby, OK and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Credit card accepted

"Foundation Pros LLC came out and did a wonderful job on repairing the foundation to my home! The quality and price were excellent! I will call them again next time I need foundation work done. Thank you!"
Response time5 hrs
Response rate99%
26 neighbors recently requested a quote
Signature Custom Builders
New to Angi
Basement - Remodel

Serving Bixby, OK and surrounding areas

Approved

Hey guys, Isaac here. I'm a local house renovator who specializes in bathroom design/builds! With over 10 years of experience, I've seen a wide range from small floor replacements, to full blown room additions (to fit a not-so-small bathroom addition) It would be my pleasure to help you complete a to-do list job or a full bathroom design/build remodel. A focal point of my business has always been the details. Seemingly unnoticed, the details are what separate a good remodel from a great one. Let's work together!

Shower/tub
Full Bathroom shot
Custom Shower Bench
Freestanding Tub
Shower Pan Tile

+6

...
Showing 1-10 of 122
Basement Remodel questions, answered by experts

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Renovations that add functionality or more comfortable floor space generally add the most value when remodeling your home. Attic or basement finishing can add floor space without altering the home's structure, saving you renovation money while adding valuable space. Smaller improvements, such as installing smart-home components or replacing entry doors and windows, also experience high ROIs. 

Yes, you can install a summer kitchen or kitchenette in your basement. They serve similar purposes as outdoor kitchens, keeping the main floor of the house cool and providing another space to cook and congregate. Basement kitchens are also a worthwhile alternative for homeowners without much space in the backyard. They come with a few logistical questions to sort out, though, like ventilation and waterproofing.

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Bixby, OK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.