Top-rated basement remodelers.

Get matched with top basement remodelers in Bixby, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Bixby, OK?

Select your specific project to find the pro for you.

Find Basement remodelers in Bixby

Avatar for Dream Ready Construction
Dream Ready Construction
5.0(
7
)
Basement - Remodel

Serving Bixby, OK and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Credit card accepted

"Foundation Pros LLC came out and did a wonderful job on repairing the foundation to my home! The quality and price were excellent! I will call them again next time I need foundation work done. Thank you!"
Response time5 hrs
Response rate99%
19 neighbors recently requested a quote
Avatar for TLK Interiors
TLK Interiors
4.1(
27
)
Basement - Remodel

Serving Bixby, OK and surrounding areas

Approved

In business since 2010

Free estimates

Warranties offered

"The planning went well. The job took a little longer than expected. Most all the plans came out very well. I had some objections to some small areas of painting. I enjoyed working with Terri."
Modern Dining Room
Kitchen Reno...
Bathroom Reno...
Bathroom Reno...
Master Suite for HER....

+10

Response time2 hrs
Response rate86%
4 neighbors recently requested a quote
...
Showing 1-10 of 119
Basement Remodel questions, answered by experts

It’s less expensive to finish your basement than it is to build an addition to your home. The average cost to refinish a basement is $32,000 (between $7 and $23 per square foot) while building an addition to your home costs $50,325 ($80 to $210 per square foot). Depending on the size of your basement and other factors, like moving plumbing and electrical, refinishing a basement is a more cost-effective option in most cases.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Save money on your basement finishing project by making cost-effective decisions such as minimizing structural changes and avoiding costly construction revisions. DIY simpler tasks such as painting or basic cleanup to reduce labor costs. You can also opt for energy-efficient fixtures and materials that may qualify for rebates or tax incentives.

Yes, it is possible to turn a regular basement into a walkout basement. Doing so involves excavating the land around at least one side of your basement foundation, installing retaining walls to create a permanent below-grade area outside your home, and then cutting into the foundation to install an exterior door that leads out to the new space. This is an expensive and time-consuming project, but it can add a lot of value and utility to your home.

Any bowing in a basement wall indicates a problem that needs to be addressed by a professional. If your basement wall bows more than 1 inch, it's time for an inspection. Generally, a wall can bow up to 30% of its thickness (around 2.5 inches for an 8-inch-thick wall) before it becomes an urgent situation. Bowing of 2 to 4 inches is more straightforward to fix than bowing of more than 4 inches, which will require significant repairs. If the bowing is more than 6 inches, the wall will likely need to be replaced. The sooner you address the problem, the easier and less expensive the repair will be.

The Bixby, OK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.