Top-rated basement remodelers.

Get matched with top basement remodelers in Bixby, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Bixby, OK?

Select your specific project to find the pro for you.

Find Basement remodelers in Bixby

Avatar for INSTALLATIONS & REMODELING INC
INSTALLATIONS & REMODELING INC
4.9(
47
)

Serving Bixby, OK and surrounding areas

Approved

In business since 1977

Free estimates

Warranties offered

"Quality workmanship, quoted time frame was spot on, completed job when advertised, did excellent work. Excited to start bathroom remodel."
Additional Photos
Additional Photos
Additional Photos
Response time1 day
5 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Dream Ready Construction
Dream Ready Construction
5.0(
7
)

Serving Bixby, OK and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Credit card accepted

"Foundation Pros LLC came out and did a wonderful job on repairing the foundation to my home! The quality and price were excellent! I will call them again next time I need foundation work done. Thank you!"
Response time5 hrs
Response rate99%
8 neighbors recently requested a quote
Avatar for TLK Interiors
TLK Interiors
4.1(
27
)

Serving Bixby, OK and surrounding areas

Approved

In business since 2010

Free estimates

Warranties offered

"The planning went well. The job took a little longer than expected. Most all the plans came out very well. I had some objections to some small areas of painting. I enjoyed working with Terri."
Modern Dining Room
Kitchen Reno...
Bathroom Reno...
Bathroom Reno...
Master Suite for HER....

+10

Response time2 hrs
Response rate86%
4 neighbors recently requested a quote
...
Showing 1-10 of 119
Basement Remodel questions, answered by experts

While bathrooms and kitchens are nearly equal in terms of renovation difficulty, kitchens are the most challenging. Kitchen design, layout, electrical, and plumbing needs all depend on each other for the success of the entire project, and mistakes early in the project can cause trouble later on.

Yes, you can install a summer kitchen or kitchenette in your basement. They serve similar purposes as outdoor kitchens, keeping the main floor of the house cool and providing another space to cook and congregate. Basement kitchens are also a worthwhile alternative for homeowners without much space in the backyard. They come with a few logistical questions to sort out, though, like ventilation and waterproofing.

Any bowing in a basement wall indicates a problem that needs to be addressed by a professional. If your basement wall bows more than 1 inch, it's time for an inspection. Generally, a wall can bow up to 30% of its thickness (around 2.5 inches for an 8-inch-thick wall) before it becomes an urgent situation. Bowing of 2 to 4 inches is more straightforward to fix than bowing of more than 4 inches, which will require significant repairs. If the bowing is more than 6 inches, the wall will likely need to be replaced. The sooner you address the problem, the easier and less expensive the repair will be.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Bixby, OK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.