Top-rated basement remodelers.

Get matched with top basement remodelers in Bixby, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Bixby, OK?

Select your specific project to find the pro for you.

Find Basement remodelers in Bixby

Avatar for Dream Ready Construction
Dream Ready Construction
5.0(
7
)
Basement - Remodel

Serving Bixby, OK and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Credit card accepted

"Foundation Pros LLC came out and did a wonderful job on repairing the foundation to my home! The quality and price were excellent! I will call them again next time I need foundation work done. Thank you!"
Response time5 hrs
Response rate99%
40 neighbors recently requested a quote
Avatar for TLK Interiors
TLK Interiors
4.1(
27
)
Basement - Remodel

Serving Bixby, OK and surrounding areas

Approved

In business since 2010

Free estimates

Warranties offered

"The planning went well. The job took a little longer than expected. Most all the plans came out very well. I had some objections to some small areas of painting. I enjoyed working with Terri."
Modern Dining Room
Kitchen Reno...
Bathroom Reno...
Bathroom Reno...
Master Suite for HER....

+10

Response time2 hrs
Response rate86%
3 neighbors recently requested a quote
...
Showing 1-10 of 119
Basement Remodel questions, answered by experts

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Unless you have extensive experience in construction work, remodeling a basement is best left to a professional. There are several tasks associated with this project that require exact precision, including:

  • Replacing insulation 

  • Replacing carpet or other flooring 

  • Adding heating and cooling

  • Adjusting or adding walls and doors

  • Altering or adding plumbing elements

If any of these elements is done incorrectly, it could severely impact the quality of your basement remodel and be dangerous. Changing a basement often comes with code safety requirements, like egress windows and proper ventilation. Therefore, leaving it up to a professional is often the best decision.

Professional remodelers streamline the process, manage permits, and handle renovations efficiently—significantly mitigating risk while maintaining standards.

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

The Bixby, OK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.