Top-rated basement remodelers.

Best basement remodelers near Oakhurst, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Oakhurst, OK?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Oakhurst - Updated Nov 2026

Avatar for Sayco Construction LLC
Sayco Construction LLC
4.5(
20
)
Basement - Remodel

Serving Oakhurst, OK and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"Austin was great to work with - professional and courteous. Completed the work more quickly than I anticipated and made a follow-up visit for a few final details afterwards. Will be having him come back to do more work in the future."
Rental remodel
Rental remodel
Rental remodel
Rental remodel
Rental remodel

+19

13 neighbors recently requested a quote
Recommended by72%of homeowners
Avatar for TLK Interiors
TLK Interiors
4.2(
28
)
Basement - Remodel

Serving Oakhurst, OK and surrounding areas

Approved

In business since 2010

Free estimates

Warranties offered

"The planning went well. The job took a little longer than expected. Most all the plans came out very well. I had some objections to some small areas of painting. I enjoyed working with Terri."
Modern Dining Room
Kitchen Reno...
Bathroom Reno...
Bathroom Reno...
Master Suite for HER....

+10

Response time2 hrs
Response rate86%
2 neighbors recently requested a quote
Avatar for Signature Custom Builders
Signature Custom Builders
New to Angi
Basement - Remodel

Serving Oakhurst, OK and surrounding areas

Approved

Hey guys, Isaac here. I'm a local house renovator who specializes in bathroom design/builds! With over 10 years of experience, I've seen a wide range from small floor replacements, to full blown room additions (to fit a not-so-small bathroom addition) It would be my pleasure to help you complete a to-do list job or a full bathroom design/build remodel. A focal point of my business has always been the details. Seemingly unnoticed, the details are what separate a good remodel from a great one. Let's work together!

Shower/tub
Full Bathroom shot
Custom Shower Bench
Freestanding Tub
Shower Pan Tile

+10

1 neighbors recently requested a quote
Avatar for T&T Tile and Bath Remodeling
T&T Tile and Bath Remodeling
New to Angi
Basement - Remodel

Serving Oakhurst, OK and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

A 20 year Retired military Veteran owned company (named after my children) we specialize in total bathroom and kitchen remodeling, we offer flooring to include tile, carpet, epoxy, hardwood, laminate etc. \n You dream it we build it. \nOur moto “Customer first Mission driven” \n Licensed and Insured \n

From small to big
Avatar for 1935 Construction
1935 Construction
New to Angi
Basement - Remodel

Serving Oakhurst, OK and surrounding areas

Approved

Free estimates

Emergency services offered

Small jobs welcome

Introducing 1935 Construction Group (1935 CG)\n\nAt 1935 Construction Group, we believe every great project starts with a vision and is brought to life through quality craftsmanship, dedication, and attention to detail.\n\nWe specialize in commercial and residential construction, renovations, remodeling, and property improvements, helping business owners, investors, and homeowners transform their spaces.\n\nFrom restaurant and bar build-outs to commercial renovations and residential improvements, our goal is to deliver reliable service, quality workmanship, and results that exceed expectations.\n\nWhether you’re launching a new business, renovating an existing property, or bringing a new development to life, 1935 CG is committed to building lasting relationships and delivering projects you can be proud of.\n\n1935 Construction Group\nBuilding Vision. Creating Value. Delivering Excellence.\n\nLet’s build something great together.

2 neighbors recently requested a quote
...
Showing 1-10 of 113
Basement Remodel FAQs, answered by experts

It is common for a contractor to ask for a down payment before starting a project, especially for jobs that require purchasing materials and equipment or hiring a crew. The deposit amount can range from 10% to 50% of the total job cost. While a request for up to 50% is not unusual, a contractor should not ask for more than that, and you should never pay for a project in full before the work has begun. To protect yourself, always discuss payment terms before starting and have a written contract that outlines the project timeline and expectations. Additionally, be sure to hire reputable contractors and check their licensing and insurance before the project begins.

If you’re not sure which method of raising the ceiling is best for you, here are a couple of considerations to help you make that decision. A professional ceiling company will be able to help you determine the best option for your home.

  • How long you are planning to live there: although raising the basement ceiling will increase the value of your home, if you’re planning to sell the house, then go for raising the house.

  • The condition of the foundation: to lower the floors, your foundation has to be intact whereas raising the house will allow you to restore the damaged foundation.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The cost of finishing a basement is about $18,400 on average. As you can see, the framing portion of this project costs less, because you’re essentially just dealing with laying the foundation for a finished basement. The finishing portion of the project involves a lot more intricate work and design, as well as high-end materials.

The average cost to remodel a basement is between $12,100 and $33,400. Depending on the project's complexity, the price can be as low as $3,500 or exceed $50,200. For a simple project like adding a home office, you might spend between $500 and $3,000. However, a more extensive project, such as adding a bathroom, can range from $6,600 to $16,500. The final cost is influenced by factors like the basement's size and condition, the type of remodel, material choices, your location, and accessibility. For an accurate price, it's best to consult with a basement remodeling team.

The Oakhurst, OK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.