Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Blackwell, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Blackwell, OK?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Blackwell

Avatar for Smith Sand & Gravel
Smith Sand & Gravel
New to Angi

Serving Blackwell, OK and surrounding areas

Approved

Smith Sand and Gravel has proudly served Blanchard, Oklahoma and surrounding communities for over 10 years. Based in Blanchard, OK, we provide reliable services within a 100-mile radius.\nOur team operates two skid loaders equipped with multiple attachments, allowing us to handle a wide range of projects efficiently and safely. For specialized jobs, we have the capability to rent additional equipment as needed to ensure the job is completed correctly and on schedule.\nWe are a hardworking, dependable crew committed to going above and beyond for every client. Our focus is quality workmanship, timely completion, and customer satisfaction.

Residential Projects
Residential Projects
Residential Projects
Residential Projects
Residential Projects

+5

PERMALIFT FOUNDATION REPAIR LLC
4.3(
61
)

Serving Blackwell, OK and surrounding areas

In business since 2002

Credit card accepted

"Company owners showed up at the agreed date and time.  They did a thorough walk around, asked what seemed to me to be the appropriate questions, and gave me an estimate on the spot.  They told me I would be contacted by their scheduler to arrange for the work crew to come do the work.  They thoroughly explained the process to be used and the precautions that would be taken to protect my property.
 A couple of days later the scheduler called to ask if their crew could come in a couple of hours since they had finished another job earlier than expected.  The crew did its work in about two hours completely to my satisfaction.  They did a good job of cleaning up the fairly small mess they had made and I am extremely satisfied with their work.
"
Recommended by93%of homeowners
Avatar for Roger Allen Restorations & Homes
Roger Allen Restorations & Homes
4.3(
19
)

Serving Blackwell, OK and surrounding areas

In business since 1947

Free estimates

"The services performed resulted in a very beautiful and functional game room area.  My wife and I are very pleased with the work.  Roger, his primary employee, Dave, and all of the sub contractors he used were outstanding.  For example, the texture blends and paint matches were exceptional.  The travertine floor is perfect.  Cabinets were of of good quality and as ordered.  The carpet was modified and replaced for a nice cost savings.  Our new room appears that it was always configured in its current state. Roger was very accessible, genuinely attempted to address all of our requests and was very easy to work with."
A small portion of a custom kitchen
Another kitchen with glass and enviroglass countertop
A million dollar foyer...
Installed Travertien after reinstalling a new concrete shower pan
The final finish

+2

Recommended by72%of homeowners
...
Showing 1-10 of 51
Asphalt Driveways questions, answered by experts

The driveway apron is a technical term referring to where a private driveway meets the public street. If there is a sidewalk in front of the house, the driveway apron is typically on the opposite side of the public sidewalk from the driveway itself.

A driveway approach is the part of a driveway where the public road meets the private driveway. This section contains several key elements, including the driveway apron, the curb cut, and the end slope. Depending on the slope of the driveway, this area may also contain the trench drain.

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

Recycled asphalt is not better than gravel, but can be a good alternative. It is inexpensive, but not as low-cost as gravel, and doesn’t tend to last as long. Recycled asphalt isn’t as dusty as gravel and is more environmentally friendly. The black look can be something that homeowners prefer. No matter what, ensure you choose an experienced recycled asphalt contractor. 

The Blackwell, OK homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.