Top-rated asphalt driveway pros.

Best asphalt driveway pros near Billings, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Billings, OK?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Billings - Updated Nov 2026

Avatar for Smith Sand & Gravel
Smith Sand & Gravel
New to Angi
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Billings, OK and surrounding areas

Approved

Smith Sand and Gravel has proudly served Blanchard, Oklahoma and surrounding communities for over 10 years. Based in Blanchard, OK, we provide reliable services within a 100-mile radius.\nOur team operates two skid loaders equipped with multiple attachments, allowing us to handle a wide range of projects efficiently and safely. For specialized jobs, we have the capability to rent additional equipment as needed to ensure the job is completed correctly and on schedule.\nWe are a hardworking, dependable crew committed to going above and beyond for every client. Our focus is quality workmanship, timely completion, and customer satisfaction.

Residential Projects
Residential Projects
Residential Projects
Residential Projects
Residential Projects

+5

PERMALIFT FOUNDATION REPAIR LLC
4.3(
61
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Billings, OK and surrounding areas

In business since 2002

Credit card accepted

"I recently bought a house and a few issues were pointed out by inspections. These guys were referred to me by friends and after getting a few bids, I had them fix my problems. They werent the cheapest, but they fixed my issues and that was all that really mattered to me.
"
Recommended by93%of homeowners
Avatar for Roger Allen Restorations & Homes
Roger Allen Restorations & Homes
4.3(
19
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - InstallGate for Driveway or Security - Install or Replace

Serving Billings, OK and surrounding areas

In business since 1947

Free estimates

"It was great, I'm looking at it now, it's gorgeous. The people who built it were fabulous. In terms of pricing, he was near the bottom of some of the others. He wasn’t the lowest, but he was near the bottom. In terms of the quality of the product, I couldn’t be happier. I love the quality. I would absolutely recommend them. They did a really nice job. In fact, whilst it was near the cheapest, nothing was skimped."
A small portion of a custom kitchen
Another kitchen with glass and enviroglass countertop
A million dollar foyer...
Installed Travertien after reinstalling a new concrete shower pan
The final finish

+2

Recommended by72%of homeowners
...
Showing 1-10 of 51
Asphalt Driveways FAQs, answered by experts

Instead of a set number of types, asphalt comes in variations designed for different needs. Some are categorized by temperature—hot mix, warm mix, and cold mix. Others are sorted by composition, like dense-graded, gap-graded (such as Stone Matrix Asphalt), porous, and mastic asphalt. There are also modified versions with added compounds like polymers, rubber, or emulsions. Instead of focusing on a number, it may be more useful to understand how contractors customize asphalt for durability, climate, and traffic conditions.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

A driveway's lifespan varies by material. Asphalt driveways typically last 15 to 30 years, while concrete driveways last longer, between 20 and 50 years. The longevity of any driveway is affected by factors like extreme temperatures, heavy traffic, and the quality of maintenance. Regular upkeep, such as filling cracks, resealing the surface, and ensuring proper drainage, can help extend its life. For gravel driveways, regrading to fill in uneven areas every year or two is recommended.

Many asphalt companies have experience with tar and chip paving, but not all. The process is unique enough—and not incredibly common enough—that you may have to look around for a tar and chip specialist. However, speaking with a driveway company is a great place to start, especially if they have experience with multiple materials.

The Billings, OK homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.