"Remark removed and replaced our large custom composite deck. Double picture frame with contrasting colors and aluminum rails. Fantastic quality construction on the new build. Very satisfied with the new product!!! Chris and his team were super courteous and respectful. Good to work with. Prompt responses to concerns or requested revisions. Would certainly hire this team again - have already recommended them to friends!"
"I hired Tristate Complete Home Repair and Maintenance to fix a bad tile job in our new shower. They came out and worked diligently to fix the sharp tile replacement and drain issue. Jeff was professional, helpful, and answered our questions. I appreciate this company and will use them in the future for other home repairs and maintenance issues."
"Scott and his team did an excellent job building a new wall right in the entrance of our house for my wife’s new office. Had 1 minor repair on a 45 corner where the seam was tearing. Scott and team were very quick to respond and came back and repaired the seam and honored warranty without any issues. Honest and reliable contractor that I would highly recommend for future work."
"Although the price seemed a little high for the scope of the project, it was well worth it in the end given the final appearance. The brickwork matched almost perfectly and is not noticeable. The employees were professional and performed the work in a timely manner."
"Great Friendly Service. Estimated to take a week or two to complete. Took a month to paint the exterior trim on my house. Mostly weather related. Be prepared if you are doing an exterior project for mother nature to get in the way! Only downfall to this project is that it took longer than expected, there are areas that were not finished i had to get them back out for. There are still some spots that are not covered. The project went over estimate. The deck sealing did not seem to do anything. I thought water would bubble up on the wood boards and they are still absorbing moisture. Waste of the extra money and I will just do it myself"
"RJE General Construction did an excellent job! They provided a free estimate which I thought was reasonable, and they completed the job within a week. The work they did was superb! It looks so much better than it did before."
A construction manager is particularly useful in the case of a large-scale build with custom design elements, so it’s usually worth it to hire one. They can help manage your budget, maintain quality control, oversee timelines, and navigate unexpected hurdles. While construction managers are pricey, they can actually save money in the long run by identifying cost-saving opportunities and ensuring the project stays within budget.
Builder-grade is one of two types of stock cabinets, whereas semi-custom designs allow homeowners some control over the color, finish, or hardware on their cabinets. Stock cabinets are sold in construction-grade and builder-grade designs. Construction-grade cabinets are usually made from inexpensive medium-density fiberboard, which is prone to moisture damage, whereas builder-grade models are a step up with higher-quality materials. Construction-grade designs are the most common type of cabinets in America.
One starting point to find a local home builder is to collect suggestions from friends and neighbors. However, it’s still wise to do some more research before you hire a builder. Read reviews to supplement any word-of-mouth recommendations. Check sources like Angi that have standards and criteria in place to screen the pros it lists can also help you find more reputable local home builders.
Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction.
Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.
How long it takes to build a log cabin depends on a variety of factors, including its size and design, and whether or not you have to clear the land. Construction can take a few weeks for a prefab log cabin on an established site, but up to eight or nine months for a custom cabin on undeveloped land. In comparison, the timeline to build a house is typically four to 12 months.
The Ross, OH homeowners’ guide to home building services
From average costs to expert advice, get all the answers you need to get your job done.
When building a home, going custom gives you the freedom to create your dream house. Learn about the cost to build a custom home and the factors to consider.
Thinking about a custom home building project? Learn about design options, average construction costs, and how to hire the right local pro for your new house.
As a home builder, marketing can be a challenge because you’re not selling the typical product. So how do you tackle marketing as a new home builder or remodeler? Use these tips to get more jobs for your construction business today.