Top-rated paving pros.

Get matched with top paving pros in Glouster, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Glouster, OH?

Select your specific project to find the pro for you.

Find Paving pros in Glouster

Avatar for Buckeye Waterproofing Inc
Buckeye Waterproofing Inc
4.1(
54
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Glouster, OH and surrounding areas

In business since 2003

Free estimates

Emergency services offered

"It went excellent.  He said I didn't need his services.  He told me what was wrong with each of the water issues I had in my basement, and he told me how to correct them myself.  I was very happy.  He was very honest, frank and helpful.  He spent close to an hour at my house, gave me great advice and didn't charge me a dime.
"
Recommended by76%of homeowners
Showing 1-10 of 32
Paving Services questions, answered by experts

You’ll first need to install a base underneath your pavers for extra stability and drainage. Otherwise, the pavers can sink into the ground, and you’ll have to reinstall them. Use a base gravel layer of 4 to 6 inches for walkways and 10 to 12 inches for driveways. Compact your gravel layer every 2 to 4 inches so it’s nice and solid. After you install your gravel base, apply a 1-inch layer of sand on top.

Like brick, paver, and cobblestone driveways, resin driveways can have intricate patterns using different colors. Aggregates can be laid to create curves, shapes, letters, or numbers. When using custom colors or patterns, homeowners can expect to add an extra $2 to $6 per square foot to achieve their desired look.

The layer of polymeric sand under the pavers plus the polymeric sand that gets swept into the joints between your pavers holds them in place in a few ways. For one, the gritty texture of the sand helps lock the pavers together. Polymeric sand also contains bonding agents that get activated by water. Polymeric sand will take between 24 and 48 hours to fully cure, so do not walk on your paver walkway before this time.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

The Glouster, OH homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.