Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Gambier, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Gambier, OH?

Select your specific project to find the pro for you.

TRUSTED BY GAMBIER, OH HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon11
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Gambier

Avatar for American Driveway
American Driveway
4.5(
264
)
Concrete Driveways - Install

Serving Gambier, OH and surrounding areas

Approved (Corporate)

In business since 2016

Free estimates

Emergency services offered

Most of what we do is full tear-out and replacement. We remove the old cracked, settling, or spalling concrete, rebuild the base the right way, and pour new. We also handle driveway extensions and widening, aprons and curb cuts, stamped and decorative concrete, and concrete repair.\n\nOur crews have poured more than 38,000 residential concrete projects. Every job gets a dedicated project coordinator, up-front pricing with no surprise change orders, and a final walkthrough before we call it finished. Licensed and insured.\n\nNeed a new driveway? Request a free estimate and we'll measure your property and give you a real number — not a range.

American driveway
American driveway
concrete driveway
before
after

+4

393 neighbors recently requested a quote
Recommended by94%of homeowners
Avatar for KVB Excavating Solutions, LLC
KVB Excavating Solutions, LLC
5.0(
14
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Gambier, OH and surrounding areas

Approved

In business since 2019

Credit card accepted

Customers say: Quick response

"Gene and his son installed drain tile in backyard. Originally was to dig around drywell and inspect and backfill. He dug down to drywell and He/I agreed the septic was functioning and the issue was drainage. We changed course and he had the tile installed by next morning. Extremely pleased with the project. He is a true professional and detailed."
419-961-5829
419-961-5829
419-961-5829
419-961-5829
419-961-5829

+22

Response time1 day
Response rate88%
3 neighbors recently requested a quote
Avatar for Enviro Construction Company, LLC
Enviro Construction Company, LLC
4.4(
19
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Gambier, OH and surrounding areas

Approved

In business since 2009

Free estimates

Offers commercial services

"Mark was quick to respond to HomeAdvisor request, listened closely to what the project was and explained what they could do. They were able to start the project in just a few days and completed the project the way Mark said they would. They used 12 tons less material than expected so he lowered the cost from the estimate. They driveway looks great."
Buckeye Lkae
Buckeye Lake
Buckeye Lake
Buckeye Lake
Buckeye Lake

+3

Response time4 days
6 neighbors recently requested a quote
Recommended by100%of homeowners
...
Showing 1-10 of 146
Asphalt Driveways questions, answered by experts

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

Asphalt paving offers several benefits, including cost-effectiveness and a quick installation process. It provides a durable and smooth surface, making it ideal for high-traffic areas. With proper maintenance, asphalt also offers longevity.

Whether it's worth it to install a heated driveway depends on how often you'll use it, your lifestyle, and your budget. If you live in a mild climate with little snowfall, then installing a built-in heated driveway system may not be worth it. If you live in a region that experiences mild snowfall, then a portable mat could work better. However, if you live in a region with heavy snowfall, it makes sense to invest in a built-in heated driveway. 

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Gambier, OH homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.