Top-rated basement remodelers.

Best basement remodelers near Whitney Point, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Whitney Point, NY?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Whitney Point - Updated Nov 2026

Kiefer-Randall Construction & Remodeling, LLC
4.9(
17
)
Basement - Remodel

Serving Whitney Point, NY and surrounding areas

In business since 2009

Free estimates

Warranties offered

"We were very pleased with the work done by them. Our bathroom remodel went smoothly and was completed in a timely maner. Everything that was promised was complete, and the staff was very pleasant to work with. We would highly recommend them and willl definitely use them for any upcoming projects."
Kitchen
Kitchen
Kitchen
Kitchen
Kitchen

+6

Recommended by93%of homeowners
Avatar for Atlas James Construction & Fabrication
Atlas James Construction & Fabrication
4.6(
10
)
Basement - Remodel

Serving Whitney Point, NY and surrounding areas

In business since 2022

Free estimates

"Atlas James made the entire process easy and efficient. They invited us to their shop to pick out a slab, educated us on differences in product and cost. Brandon came out to template and helped brainstorm about edges and gromet placement. And when it came time to install, they had it done in no time. Would definitely recommend."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+3

Recommended by90%of homeowners
Avatar for Parlor City Construction and Property Services, Inc.
Parlor City Construction and Property Services, Inc.
3.9(
20
)
Basement - Remodel

Serving Whitney Point, NY and surrounding areas

In business since 1999

Free estimates

Warranties offered

"Marc and his staff did an amazing job on our house! From the basement remodel to the exterior siding and breezeway it looks like a new house! We were very pleased and would highly recommend Parlor City Construction!"
Johnson City addition
Johnson City
Johnson City
Johnson City
Popeyes

+16

Response time2 days
Response rate89%
Recommended by92%of homeowners
Avatar for PARLOR CITY DRYWALL & PAINTING, Inc.
PARLOR CITY DRYWALL & PAINTING, Inc.
3.8(
13
)
Basement - Remodel

Serving Whitney Point, NY and surrounding areas

In business since 1984

Free estimates

"We hired Marc and Parlor City Construction to enlarge our living room, by installing a LVL beam in the ceiling, replacing/rerouting electric outlet, reworking our floor to match and drywall and plaster our entire living room ceiling. The job was completed very professionally, on time service and at a reasonable cost. Each and every employee of Parlor City Construction was professional, congenial and trustworthy. We will in the future be hiring Parlor City Construction for further remodeling of our home."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

Recommended by75%of homeowners
...
Showing 1-10 of 59
Basement Remodel FAQs, answered by experts

Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction. 

Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.

In addition to overseeing new home builds, construction managers work on large renovations and major remodels. For example, they may work with designers and oversee the construction of a finished basement, kitchen renovation, or a home addition. They may also oversee large-scale remodels, such as the update of a historic home. Construction managers step into small projects for more specific assistance, such as building budgets and compiling the team.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

The Whitney Point, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.