Top-rated basement remodelers.

Get matched with top basement remodelers in Endicott, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Endicott, NY?

Select your specific project to find the pro for you.

TRUSTED BY ENDICOTT, NY HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon25
    Verified basement remodels reviews

Find Basement remodelers in Endicott

Avatar for DW Construction
DW Construction
4.6(
44
)
Basement - Remodel

Serving Endicott, NY and surrounding areas

Approved

In business since 2000

Free estimates

Warranties offered

"Mr Woolever came to give us an estimate to move oddly placed kitchen cabinets. He gave us a better idea about where to move them so as to maximize their use. And he did the cabinet move for a great price. While he was at our home, we discussed the problem with the garage door, he noticed the garage door frame was slanted. Upon further inspection, he found the header beam was split. So Mr Woolever suggested it should be fixed immediately. Our garage door service company concurred. So within a day of the cabinet job being finished, he also finished reframing the garage opening. Needless to say, the garage door seals, and our home is much warmer. Both jobs at an amazing price....and top notch customer service and craftsmanship. He even cleaned up some of our mess when he was tidying up from his work. Very highly recommended. Thank you."
Rebuild Deck
Rebuild Deck
Rebuild Deck
Rebuild Deck
Rebuild Deck

+35

Response time1 day
Response rate91%
1 neighbors recently requested a quote
PPHI
4.7(
117
)
Basement - Remodel

Serving Endicott, NY and surrounding areas

In business since 1999

Free estimates

Emergency services offered

"Excellent job, very professional, courteous, and timely. Rob handled everything on my project, the job site was always very clean and tidy throughout. He was punctualand reliable. Most important, he's an extremely nice guy. He's one of those type of people that you feel like you have known forever after having just met him. He is now my go to guy!"
Recommended by96%of homeowners
Kiefer-Randall Construction & Remodeling, LLC
4.9(
17
)
Basement - Remodel

Serving Endicott, NY and surrounding areas

In business since 2009

Free estimates

Warranties offered

"We were very pleased with the work done by them. Our bathroom remodel went smoothly and was completed in a timely maner. Everything that was promised was complete, and the staff was very pleasant to work with. We would highly recommend them and willl definitely use them for any upcoming projects."
Kitchen
Kitchen
Kitchen
Kitchen
Kitchen

+6

Recommended by93%of homeowners
Avatar for Rost Construction, LLC
Rost Construction, LLC
4.7(
25
)
Basement - Remodel

Serving Endicott, NY and surrounding areas

In business since 2016

Free estimates

Credit card accepted

"I had my kitchen painted; some plastering had to be done ahead of time to correct some cracking that had taken place over the years. The job was completed in 2 days and is 100% nicer. I had very little cleanup to do afterwards. The painter did a great job!"
Project Complete!
Shower Tiling
Bathroom renovation
Flooring project
Flooring project

+22

Response time10 hrs
Response rate90%
Recommended by88%of homeowners
Avatar for Dan Brown Construction, LLC
Dan Brown Construction, LLC
4.3(
26
)
Basement - Remodel

Serving Endicott, NY and surrounding areas

In business since 2013

Emergency services offered

Credit card accepted

"Dan Brown Construction is Outstanding! There arenâ t enough words for me to describe the kindness, workmanship, communication and attention to detail that Dan and his team displayed while completing work for us recently. Dan and his team went above and beyond to get the job done quickly, while ensuring top craftsmanship and keeping us in the loop every step of the way. We will absolutely reach out to Dan Brown Construction for all of our building needs going forward as well as refer him without hesitation to anyone we know needing work done. Thank you again for making a difficult time seem a little easier."
Tile
Beautiful New Deck/Pool Area
Complete Basement w/ New Bathroom Added
Tile
Beautiful New Deck/Pool Area

+61

Response time1 day
Recommended by100%of homeowners
Avatar for J&B Home Improvements
J&B Home Improvements
5.0(
9
)
Basement - Remodel

Serving Endicott, NY and surrounding areas

In business since 2023

Free estimates

Small jobs welcome

"I highly recommend this company. They remodeled my kitchen/dining room and it turned out amazing! Beautiful work and in a timely manner. I couldn't be happier with everything and grateful for how professional and courteous they are!"
Before and after pictures
Before and after pictures
Before and after pictures
Before and after pictures
Before and after pictures

+38

Response time30 mins
Response rate100%
Recommended by100%of homeowners
...
Showing 1-10 of 70
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Basements are commonly converted into game rooms. The potential challenges you may run into include controlling moisture, working with low ceilings, limited natural light, and the need for additional electrical or HVAC work. Addressing these issues can add to the total cost, but it ensures a comfortable and functional space.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

When choosing materials for finishing basement walls, consider factors such as moisture resistance, durability, and fire resistance. Opt for materials specifically designed for basement environments, like moisture-resistant drywall or cement board. Insulation with vapor barriers can help regulate temperature and prevent condensation. Consider using mold-resistant paints or coatings. 

Research and consult with experts to select materials that are suitable for your specific basement conditions and intended use. Prioritize quality and compatibility to achieve long-lasting and aesthetically pleasing results.

Walkout basements cost more than other kinds of basements, and can also increase your risk of leaks as well as a loss of insulation, leading to higher heating and cooling costs. Improperly installed walkout basements may lead to structural issues with your foundation, so ensure you’re working with a contractor who has extensive experience with this kind of basement.

The Endicott, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.