Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Sherburne, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Sherburne, NY?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Sherburne

Avatar for AJM LAND PROS LLC
AJM LAND PROS LLC
5.0(
5
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Sherburne, NY and surrounding areas

Approved

In business since 2025

Credit card accepted

Offers commercial services

"This business is built on customer service and getting the job done right, very pleased with the work that was done which included a few stumps removed and brush clearing and grading for a driveway. I would recommend this business to anyone who wants the job done right in a timely manner. 10/10 experience."
20 neighbors recently requested a quote
...
Showing 1-10 of 63
Asphalt Driveways questions, answered by experts

The dimensions of a driveway apron vary based on local building codes, the width of your driveway, and the distance between the driveway and the road. On average, aprons range from 12 to 24 feet wide and 8 to 18 feet long. Typically, the end of the apron connected to the driveway matches its width—such as 10 to 12 feet for a single-car driveway—while the end at the street flares out to allow cars to turn in and out more easily. In some areas, you may not be responsible for the portion of the apron that extends beyond the sidewalk, but this depends on local laws.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

In the United States, roads are usually categorized as one of three types: public roads, other drivable roads, and non-drivable roads. These categories dictate how a road can be used; a non-drivable road might be classified that way because it is heavily damaged and unsafe for cars.

Your city or county will have guidelines about the minimum and maximum width and length of private roads. The average private road is 12 feet wide, and length, of course, depends on your property. Requirements also depend on the amount of traffic and types of vehicles your road experiences. Check with local ordinances before planning a road on your property.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Sherburne, NY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.