Top-rated ev charger installation pros.

Best ev charger installation pros near Red Hook, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your ev charger installation project in Red Hook, NY?

Select your specific project to find the pro for you.

TRUSTED BY RED HOOK, NY HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon171
    Verified ev charger installation services reviews

Top-Rated Ev charger installation pros in Red Hook - Updated Nov 2026

Avatar for Antonio Ferrao Electric
Antonio Ferrao Electric
4.6(
43
)
Electric Vehicle Charging Station InstallationElectric Vehicle Charging Station Installation - For BusinessElectric Vehicle Charging Station Installation - For Business - Materials Not Provided+3 more

Serving Red Hook, NY and surrounding areas

Approved

Super Service Award Winner

In business since 1989

Free estimates

Emergency services offered

"Very good experience. We needed a 200’ length of buried conduit installed between our breaker panel in the garage and a motorized front gate on the driveway. The electricians arrived on schedule, did a neat, professional job and left the work area spotless - no packaging or offcuts were left behind. Very happy with the result. Recommended."
Screwless cover plates
Pantry
Nest Thermostat
Staircase lighting
Kitchen

+52

Response time10 hrs
Response rate100%
Recommended by65%of homeowners
Avatar for Least Resistance Electrical Contracting LLC
Least Resistance Electrical Contracting LLC
5.0(
14
)
Electric Vehicle Charging Station Installation - Materials Not ProvidedElectric Vehicle Charging Station Installation - Materials Provided by Consumer

Serving Red Hook, NY and surrounding areas

Approved

In business since 2025

Emergency services offered

Warranties offered

"When I placed a request for the installation of two outlets on Angie's list, Steve got in touch right away but wasn't overly pushy either [which happens sometimes]. Between the three weeks I first spoke with him and the job, he was professional, informative, and responded to texts quickly and I knew exactly what to expect on-site as well as the cost. He sent pictures and cost of a similar job to help explain the work and the estimate. Steve identified some other issues with my electrical panel and made some small fixes--without increasing the cost of the job--and made some recommendations for me to consider in the future. He was courteous, professional, and seemed to care about the work and about communicating what he was doing and why. I would definitely turn to him first for my next job."
Let There Be Light!
Sub Panel
Early Stages of Electrical Rough In.
4 Gang Switch Box
Sub Panel Service Entry

+17

4 neighbors recently requested a quote
Santella Electric
4.7(
32
)
Electric Vehicle Charging Station InstallationElectric Vehicle Charging Station Installation - For BusinessElectric Vehicle Charging Station Installation - For Business - Materials Not Provided+3 more

Serving Red Hook, NY and surrounding areas

Approved

Customers say: Terrific value

"Great ! Good communication re. type of job and date for installation. Lights installed with care, look great. Already thinking of using Santella Electric for future, bigger job. Good people are hard to find."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Response time2 days
1 neighbors recently requested a quote
Recommended by77%of homeowners
Avatar for David Seche Electric
David Seche Electric
4.3(
18
)
Electric Vehicle Charging Station Installation - Materials Not ProvidedElectric Vehicle Charging Station Installation - Materials Provided by Consumer

Serving Red Hook, NY and surrounding areas

Approved

In business since 1986

Free estimates

Credit card accepted

"Dave and his team were efficient, professional, and highly skilled. Dave followed up on our requests promptly, showed up exactly as promised, and really knows his stuff! His price was fair and the quality of his work exceeded our expectations. Highly recommend!"
Gallery
Response time1 day
Response rate93%
5 neighbors recently requested a quote
Avatar for JSP Home Services
JSP Home Services
3.9(
140
)
Electric Vehicle Charging Station Installation - Materials Not ProvidedElectric Vehicle Charging Station Installation - For Business - Materials Not ProvidedElectric Vehicle Charging Station Installation - For Business - Materials Provided by Consumer+1 more

Serving Red Hook, NY and surrounding areas

Approved

In business since 2006

Free estimates

Credit card accepted

"5++++Rj Mazzucca is amazing. Awesome salesman, awesome craftsmanship, went above and beyond. Was happy how quickly someone got out here to look at. Within hours of me calling and by the next day installed. I know I could have got a cheaper price, but was afraid it would not have been done in a timely manner. This is a 1979 mobile home and everything is old and turns into a project when replacing things. Rj did an excellent job."
JPS
20 neighbors recently requested a quote
Recommended by86%of homeowners
...
Showing 1-10 of 54
Ev Charger Installer FAQs, answered by experts

Yes, you should get a quote or an estimate from an electrician. Most electricians offer free estimates or quotes. When getting quotes, do your research and verify each electrician’s license. Get quotes from three different electricians to compare. If the prices or items listed appear different on the quotes, ask the electrician to clarify. Learning as much as you can about the electrical work you want done will help you get the most accurate estimate. 

The cost of installing a 240-volt outlet for an electric car averages between $175 and $300. Depending on the type of outlet as well as labor costs, you might pay as little as $130 or upwards of $400. Hiring a professional electrician makes up the bulk of the expense but ensures a safe and code-compliant installation.

Local electricians with experience in your area understand the local building codes, which is very important when doing new electrical work. They also have experience with the kind of electrical problems homes in your location may have, and even the components that were used in the original construction, which leads them to make faster and better decisions.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

Charging your EV every night isn’t always necessary. Most EVs have sufficient range to cover daily commutes without needing a nightly charge, particularly if you have a Level 2 charger. Charging once every few days or as needed can prolong the battery’s lifespan.

The Red Hook, NY homeowners’ guide to ev charger installation services

From average costs to expert advice, get all the answers you need to get your job done.