Top-rated basement remodelers.

Best basement remodelers near Groton, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Groton, NY?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Groton - Updated Nov 2026

Avatar for DW Construction
DW Construction
4.6(
44
)
Basement - Remodel

Serving Groton, NY and surrounding areas

Approved

In business since 2000

Free estimates

Warranties offered

"Derek Woolever with DW Construction was hired to remodel a kitchen at ny residence. Derek did a beautiful job and is very honest friendly and dedicated to his work. I will be hiring him again in the near future. Thelma Jones :)"
Rebuild Deck
Rebuild Deck
Rebuild Deck
Rebuild Deck
Rebuild Deck

+35

Response time1 day
Response rate91%
Recommended by89%of homeowners
Avatar for PARLOR CITY DRYWALL & PAINTING, Inc.
PARLOR CITY DRYWALL & PAINTING, Inc.
3.8(
13
)
Basement - Remodel

Serving Groton, NY and surrounding areas

In business since 1984

Free estimates

"We hired Marc and Parlor City Construction to enlarge our living room, by installing a LVL beam in the ceiling, replacing/rerouting electric outlet, reworking our floor to match and drywall and plaster our entire living room ceiling. The job was completed very professionally, on time service and at a reasonable cost. Each and every employee of Parlor City Construction was professional, congenial and trustworthy. We will in the future be hiring Parlor City Construction for further remodeling of our home."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

Recommended by75%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Groton, NY and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
...
Showing 1-10 of 51
Basement Remodel FAQs, answered by experts

It is common for a contractor to ask for a down payment before starting a project, especially for jobs that require purchasing materials and equipment or hiring a crew. The deposit amount can range from 10% to 50% of the total job cost. While a request for up to 50% is not unusual, a contractor should not ask for more than that, and you should never pay for a project in full before the work has begun. To protect yourself, always discuss payment terms before starting and have a written contract that outlines the project timeline and expectations. Additionally, be sure to hire reputable contractors and check their licensing and insurance before the project begins.

Costs are guided by renovation scope, materials chosen, project duration, structural needs, and labor. Prioritizing tasks prevents unforeseen expenses.

It’s less expensive to finish your basement than it is to build an addition to your home. The average cost to refinish a basement is $32,000 (between $7 and $23 per square foot) while building an addition to your home costs $50,325 ($80 to $210 per square foot). Depending on the size of your basement and other factors, like moving plumbing and electrical, refinishing a basement is a more cost-effective option in most cases.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

You can paint your ceiling or install a drywall ceiling if the ceiling is unfinished, as they take up less headroom than drop ceilings. 

If there are pipes in the way of ceiling installation, you can do one of two things: reroute the pipes or adjust the installation to fit, which will cost extra.

The Groton, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.