Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Clinton, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Clinton, NY?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Clinton

Avatar for Paradise Pools & Construction Service, Inc.
Paradise Pools & Construction Service, Inc.
4.3(
20
)

Serving Clinton, NY and surrounding areas

In business since 2013

Free estimates

Offers commercial services

We pride our company on reliability, great communication, integrity, and quality work. We are experts in our trade and will do our best to keep you as educated as we can on your particular task or project. We look forward to earning your business!

project photos
Pittsford  pool ren
Pittsford  pool ren
Pittsford  pool ren
Pittsford  pool ren

+5

Recommended by94%of homeowners
Paradise Pools and Construction Service, Inc.
4.3(
20
)

Serving Clinton, NY and surrounding areas

In business since 2013

Free estimates

Emergency services offered

"I actually don't know where to start. Kris came out to give us a quote on a new pool liner. Within the hour he was there he replaced our pool motor that was damaged by recent heavy rain, fixed a leak from the pool line to filter, fixed our drooping liner from the rim in several places and said we still had several years before replacing our liner. What salesman does that? When he left, my husband said did this just happen? We wanted Kris to move in and fixed everything in our house. Needless to say, we were blown away by his professionalism and experience to fix all issues. We highly recommend Kris and will definitely go to him if anything else arises."
Response time2 days
Recommended by94%of homeowners
Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)

Serving Clinton, NY and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Nrf pools
New to Angi

Serving Clinton, NY and surrounding areas

In business since 2022

Free estimates

Offers commercial services

NRF Pools is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests and make their concerns the basis of our business. Please give us a call today!\n

Install Above Ground Pools questions, answered by experts

A pool heater is worth the expense, given that it can extend your swimming season by several months, depending on where you live. For many, adding a pool heater allows the pool to remain in service from May through mid-October. Even temperatures in the 40s and 50s are tolerable when the water in the pool is heated.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The best way to dissolve algae is to use pool shock. The shock increases the free chlorine levels in your pool, which in turn kills bacteria, microorganisms, and algae. You can opt for granulated shock that you mix with water or a premixed liquid shock.

Keep in mind that using pool shock is just one of the steps you need to take to get rid of algae from your pool. Unless you also brush, vacuum, and clean the filter, your algae problem may return.

While you can install an above ground pool on most level surfaces, you’ll need sand to protect your liner from tearing. For example, rocks, plants, and twigs can take a toll on your liner. Adding sand will help level the pool even more. For additional support, you can also use angled foam or a foam pool cove.

Building an inground pool is a job best left to the pros. Excavating the area and building the pool requires heavy equipment and specialized training, and pools have complex plumbing and electrical systems. Unless you’re experienced in these areas, you’re better off hiring a pool contractor to make sure the job gets done safely and correctly. 

The Clinton, NY homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.