Top-rated basement remodelers.

Get matched with top basement remodelers in Lockwood, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Lockwood, NV?

Select your specific project to find the pro for you.

Find Basement remodelers in Lockwood

Curtis Bros., Inc.
3.6(
30
)
Basement - Remodel

Serving Lockwood, NV and surrounding areas

In business since 2008

Free estimates

Emergency services offered

"Overall, we are very pleased with Curtis Bros. The suppliers they recommended were a tremendous assist and invaluable in getting exactly what we wanted. Personnel arrived every day as scheduled and on time. Great care was taken to minimize dust, debris, and maintain non-construction areas. Personnel were friendly, courteous, and asked for our input whenever a question or concern arose. Finished product looks fantastic! Advice for folks looking to remodel: 1 - Price out materials ahead of time. 2 - Allow an appropriate amount of time to complete the job."
Contemporary Kitchen - Brown Cream Stainless Steel Step Can
 Wide View
 Bathroom
Recommended by83%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Lockwood, NV and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Troy Pinney Custom Carpentry
4.2(
5
)
Basement - Remodel

Serving Lockwood, NV and surrounding areas

In business since 1991

Free estimates

Emergency services offered

"Troy was on time to look at job. Spent time going over what he could do to help remodel a bathroom. He explained only the part of the job he could do and I would need to hire others to complete the total work being done such as a plumber and tile person. I was moving a shower, making it bigger, having it tiled and then a cabinet made for the old shower area. He had ideas about what to do and it made sense to us.
He was prompt and on time for meeting. He was a real nice guy and was coming from Carson to do the job in Reno.
Our main concern was that after this original visit, I got one call that he was busy and could not get the estimate done in a timely matter and that he would do it the following week.
I never got an estimate or even another phone call. It has been 3 months with no contact and I hired another person to do the job.
A phone call would have been better than nothing. By waiting for his call and no response to email it delayed my job by months.
"
Recommended by100%of homeowners
Showing 1-10 of 17
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Building up by adding square footage to the top of your home is often less expensive than adding a basement, but it depends on the specifics of your house, your property, and supply costs. Because building a basement requires excavation, it can be a more expensive option than building up.

Although it’s not required, air ventilation in a finished basement can help improve the air quality, prevent moisture and mold issues, keep musty odors away, and also maintain the air quality throughout the rest of your home. Proper ventilation will help maintain the value of your investment in finishing your basement. Try basement ventilation methods like installing vents or a dehumidifier for best results.

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

Efficient appliance positioning, optimizing existing plumbing, and sourcing energy-efficient materials reduce financial impact and increase sustainability.

The Lockwood, NV homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.