Top-rated basement remodelers.

Get matched with top basement remodelers in Pioche, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Pioche, NV?

Select your specific project to find the pro for you.

Find Basement remodelers in Pioche

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Pioche, NV and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Sasso Services
Sasso Services
5.0(
1
)
Basement - Remodel

Serving Pioche, NV and surrounding areas

In business since 2022

Emergency services offered

Credit card accepted

"Sasso services did an excellent job on a variety of projects for me. I will definitely keep them on my speed dial to assist with big and small items from the home-do list. Projects they have completed for me includes: custom built-in garage shelves, finish electrical in finished man-cave shed, installed mini-split AC unit, replaced kitchen light fixtures, put together garden shed purchased from CostCo, general maintenance and even some yard work/cleanup."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+13

Recommended by100%of homeowners
Basement Remodel questions, answered by experts

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

For most basement remodels, you’ll want to hire a general contractor. This is for a number of reasons, but the main two are that general contractors have dedicated teams they are comfortable with, and hiring one means you only have to deal with one pro. You may also get a better project quote since they can lump all their work and subcontracting into a single quote. 

Yes, it is possible to turn a regular basement into a walkout basement. Doing so involves excavating the land around at least one side of your basement foundation, installing retaining walls to create a permanent below-grade area outside your home, and then cutting into the foundation to install an exterior door that leads out to the new space. This is an expensive and time-consuming project, but it can add a lot of value and utility to your home.

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

Permits may be required for major repairs, structural work, or electrical and plumbing restoration after a flood. Check with your local building department to determine permit requirements and associated fees for your flooded basement cleanup project. Obtaining the correct permits helps ensure work is done safely and up to code.

The Pioche, NV homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.