Top-rated basement remodelers.

Get matched with top basement remodelers in Pioche, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Pioche, NV?

Select your specific project to find the pro for you.

Find Basement remodelers in Pioche

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Pioche, NV and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Sasso Services
Sasso Services
5.0(
1
)
Basement - Remodel

Serving Pioche, NV and surrounding areas

In business since 2022

Emergency services offered

Credit card accepted

"Sasso services did an excellent job on a variety of projects for me. I will definitely keep them on my speed dial to assist with big and small items from the home-do list. Projects they have completed for me includes: custom built-in garage shelves, finish electrical in finished man-cave shed, installed mini-split AC unit, replaced kitchen light fixtures, put together garden shed purchased from CostCo, general maintenance and even some yard work/cleanup."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+13

Recommended by100%of homeowners
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

When considering finishing your basement, take into account a few pros and cons:

Pros

  • Can increase the value of your home

  • Separate space from the rest of the house 

  • Customize and personalize the basement to suit your needs and style

  • Increase the amount of living space in your home

Cons

  • May not regain enough value to cover the cost of finishing

  • Lack of natural light if it’s below ground level

  • Moisture or flooding can cause costly damage

  • Installing plumbing and electrical can be messy and costly

Kitchens and bathrooms are typically the most expensive rooms to renovate. The high cost is due to several factors, including expensive appliances like ranges, hoods, and refrigerators, as well as costly fixtures. The 'bones' of the room, such as electrical and plumbing, are also expensive to move or replace. Because of the vast amount of prep work, finishing, and specialized labor involved in a relatively small footprint, these projects can cost double or more than a living space remodel. Even when trying to renovate on a budget, kitchens and bathrooms will likely carry a hefty price tag.

The cost of finishing a basement is about $18,400 on average. As you can see, the framing portion of this project costs less, because you’re essentially just dealing with laying the foundation for a finished basement. The finishing portion of the project involves a lot more intricate work and design, as well as high-end materials.

Yes, you can add a bathroom to an unfinished basement, but you’ll want to take proper precautions if doing so. As with any bathroom addition, you’ll need to make sure that it’s approved by local building authorities first. With unfinished basements, you especially need to keep an eye on proper ventilation practices.

The Pioche, NV homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.