Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Pioche, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Pioche, NV?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Pioche

Avatar for TSV Construction, LLC
TSV Construction, LLC
1.0(
1
)
Concrete Finishing, Overlays & Coloring - Apply

Serving Pioche, NV and surrounding areas

In business since 2022

Free estimates

Emergency services offered

Our mission is to be a provider that brings back the personal touch with our customers. We will build a relationship that will last a lifetime after you see our quality work. As a locally owned and operated business we feel invested in our clients and constantly strive for customer satisfaction. Call or message us to schedule an estimate today!

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+5

Epoxy Flooring questions, answered by experts

Investing in stained and sealed concrete can be worthwhile and may catch the eye of potential homebuyers during resale. The look is sleek and modern, allowing new buyers to envision a versatile list of home decor options. Stained concrete floors are also easy to maintain and feature a custom look that stands out compared to gray, unsealed concrete surfaces.

Mix the resurfacer into a sticky mixture. The consistency should look like mashed potatoes. Use a squeegee to push the resurfacer across the pitted area and smoothen the surface with a cement trowel flush. Make sure you protect any expansion joints with a weather strip. Alternatively, cut out any resurfacer that touched the joint once the mixture begins to harden.

Epoxy and polyurethane sealers can last five to 10 years, while acrylic sealers last two to three years or more depending on the use, wear of the surface, and type of sealer you choose. Areas that see heavy traffic or extreme ice and snow may require more frequent sealing. Test your concrete every two years to gauge how it responds to absorbing water or if it fully repels it for longer than 20 seconds.

Resurfacing a garage floor takes about eight hours on average, with another couple hours over three days to do the epoxy. Epoxy goes on in three coats, with each coat taking 24 hours to dry and cure. You’ll need to keep foot and vehicle traffic off of your garage floor for around 4 days in total when replacing your garage floor, so be sure to plan ahead before you start. This is a great time to organize your garage since you’ll need to move everything out to apply the epoxy.

You primarily need to be concerned about the moisture level in concrete when you are dealing with a basement or other below-ground part of your house. If you find any indication of moisture in your subterranean space, consider calling in a professional for further testing and moisture control solutions.

The Pioche, NV homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.