Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Pioche, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Pioche, NV?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Pioche

Avatar for FHM Construction LLC
FHM Construction LLC
New to Angi

Serving Pioche, NV and surrounding areas

In business since 2022

Free estimates

Emergency services offered

FHM Construction LLC is a local family-owned, business that provides Residential and Commercial Concrete, Asphalt, and Excavation Services. Please contact us for your new project and our experienced team will get the job done. Whether you are looking for a Driveway, Walkway, or a large Parking lot we are the right choice.

Asphalt Parking Lot
Residential Asphalt Driveway
Avatar for TSV Construction, LLC
TSV Construction, LLC
New to Angi

Serving Pioche, NV and surrounding areas

In business since 2022

Free estimates

Emergency services offered

Our mission is to be a provider that brings back the personal touch with our customers. We will build a relationship that will last a lifetime after you see our quality work. As a locally owned and operated business we feel invested in our clients and constantly strive for customer satisfaction. Call or message us to schedule an estimate today!

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+5

Concrete Mudjacking questions, answered by experts

Polyjacking can be a permanent solution to sunken concrete if you also address the underlying issue—like poor drainage—at the same time. The polyurethane material itself can last as long as or even outlast the concrete you’re lifting it with. Your sunken concrete issue will likely return if you don’t couple polyjacking with proper drainage to prevent future soil movement and sinking.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

It restores concrete, prevents replacement cost disruptions, reduces trip hazards, and provides stability at a lower cost.

Mudjacking restores level surfaces, prevents further damage, and is more cost-effective than a full replacement.

Most projects take 1-3 hours, with immediate usability after completion.

The Pioche, NV homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.