Get matched with top subcontractors in Silver City, NM

Silver City homeowners rate subcontractors in our network

4.3

(73 reviews)

Top-rated subcontractors.

Need a pro for your subcontracting project in Silver City, NM?

Select your specific project to find the pro for you.

Find Subcontractors in Silver City

Babcock Construction
4.7(
41
)

Serving Silver City, NM and surrounding areas

Approved

In business since 1968

Free estimates

Credit card accepted

"Three generations of Babcocks are involved in this business and working with them was delightful. They responded promptly to our initial inquiry via Angie's List and quickly arranged some initial work so we could have a floor installed. They helped us design a new kitchen and built cabinets to fit it. They also built custom bookshelves for our library. Their work is first-rate. They were efficient and imaginative. Prices were fair and their subcontractors reliable. In short, they were the best contractors we have ever worked with."
Response time4 days
6 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Silver City, NM and surrounding areas

In business since 2006

Credit card accepted

"I assumed that this was an actual vs virtual consultation. When I contacted vendor, he explained that this was a virtual consultation. He also apologized and told me that there had been a fair amount of confusion among Angie's list customers on this point. Vendor was courteous and accommodating."
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
SMRT Construction Services Inc.
3.3(
88
)

Serving Silver City, NM and surrounding areas

In business since 1984

Free estimates

Emergency services offered

"I wish that they had told me not to do it at all. They worked really hard, but they were not able to get it done. I did not know that it would cost so much to do the whole deck. It did not get the whole thing done. I was more preventative and they only did half of it. I did not know that it was going to take so long. I was only able to get half of it done, they did do what was said in the advertisement. I could not afford to have the rest of it done. It has been too difficult to deal with. I did pay for a couple of extra hours. They came out a couple of weeks after I made the purchase. The quality was good for what they were supposed to do."
Recommended by58%of homeowners
Avatar for Jirons Transport & Mobile Welding Repair
Jirons Transport & Mobile Welding Repair
5.0(
1
)

Serving Silver City, NM and surrounding areas

In business since 2020

Free estimates

Emergency services offered

Mobile Welding Services: Gates, Hinges, Stairs, Handrails, Doors, Storage Tanks, Equipment, Farm Maintenance, Equipment Repairs, ETC... (available 24/365. Emergency Welding Repairs. Pipe Fences, Barns, Gates, sheds, carports available as well)\n\nCall us today for a free quote! \n

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+34

Recommended by100%of homeowners
Showing 1-10 of 18
Subcontractors questions, answered by experts

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

You likely need to hire an architect for your new house design and build, unless you have the design skills and experience with building regulations and standards needed to get your plans approved. If you are able to meet the design requirements, you can hire a draftsperson to create the blueprints for the builders to follow.

Villa exterior features often include large windows, arched doorways, patios, terraces, greenery, and gardens. Common exterior colors for villas are whites and off-whites, soft browns, and clay tones. 

The process typically takes 2-6 weeks, depending on the project size and level of customization.

Buying a house is easier than building one from scratch. Buying an existing home is almost always faster, even if you need to make renovations once you move in. When you hire the right team to build a home, they will simplify the design and build phases so that there is little guesswork throughout the process, but building new construction will almost always take longer than buying an existing home.

The Silver City, NM homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.