Top-rated excavation pros.

Get matched with top excavation pros in Linden, NJ

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Linden, NJ?

Select your specific project to find the pro for you.

TRUSTED BY LINDEN, NJ HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon43
    Verified excavation services reviews

Find Excavation pros in Linden

Avatar for Andres General Construccion
Andres General Construccion
5.0(
9
)
Building Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping - For Business

Serving Linden, NJ and surrounding areas

Approved

In business since 2010

Free estimates

Emergency services offered

"We recently bought a house in need of work, my wife and I thought it would be a great idea to do our own projects around the house. Soon enough , we realized we had no idea how to proceed with our outdoor space. He hired Andres general construction, they provided guidance and a great customer service. We are very pleased with the outcome. I will be definitely hiring them again for future projects. Thank you Andres!"
Driveway
Paint job
Paint job
Composed wood deck
Response time7 hrs
Response rate87%
Recommended by87%of homeowners
Avatar for Tito & Son Construction, LLC
Tito & Son Construction, LLC
4.4(
41
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Linden, NJ and surrounding areas

Approved

Super Service Award Winner

In business since 1979

Free estimates

Emergency services offered

"The rep, Niles, from this construction company is very friendly and very accommodating. He is also very attentive to details. I also ended up using this company for another home project that I have and will keep them in mind for other future projects. Friendly, dependable, and reliable."
Structural Beam
Structural Beam
Structural Beam
Bathroom Remodel
Bathroom Remodel

+42

Response time7 hrs
Response rate85%
4 neighbors recently requested a quote
Avatar for Panaro Outdoor Design, LLC
Panaro Outdoor Design, LLC
4.3(
172
)
Landscape - Minor Grading or Resloping

Serving Linden, NJ and surrounding areas

Approved

In business since 1979

Free estimates

Small jobs welcome

"I hired Panaro for several projects, including the installation of a patio, walkway and steps as swell as grading and sod installation. They were top notch in all respects."
Pavers Down
Pavers Finished and Locked in
Gino himself putting the finishing touches
Beautiful shrubs
Another walkway done

+299

Response time1 day
Response rate88%
18 neighbors recently requested a quote
...
Showing 1-10 of 167
Excavating questions, answered by experts

The best method for digging a trench depends on the scope of the project. For a short, shallow trench (less than 2 feet deep) in light, soft soil, digging by hand may be sufficient. However, digging by hand is labor-intensive, so consider the effort required. A machine trencher is the better option for longer trenches (over 100 feet), deeper ones, or when dealing with difficult soil conditions, such as rocky or hard ground, or obstructions like tree roots. A machine can save significant time and energy in these situations.

Sewer lines can be buried anywhere from 18 inches to 8 feet deep, with a common average depth between 18 and 30 inches. The exact depth depends on local factors like climate and soil type. In colder regions, pipes must be buried deeper (below the frost line) to prevent freezing, sometimes as deep as 8 feet. The digging depth can also impact the cost of sewer line replacement. To find the specific depth for your property, you can check the building plans for your system, which should be on file with your city or local sanitation department since permits are required for installation.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

You can dig 60 to 80 linear feet by hand per day depending on the depth. Digging a 100-foot trench by hand will take you two work days, but it can take longer if you have heavy or rocky soil. If you’re digging a deep trench or one that’s over 100 feet, consider renting a mechanical trencher, such as a walk-behind or ride-on, or calling a pro for help. 

Hard soil could be a sign of overly dry dirt, either from poor drainage or drought. It's important to test the nutrient levels, density, and drainage capacity of your soil to see if it's absorbing water properly. Begin by adding a light layer of water and observing how long the soil retains moisture. If you experience a good deal of runoff, you may need to aerate your lawn, apply a wetting agent, or hire a professional for a closer look.

The Linden, NJ homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.