Top-rated excavation pros.

Best excavation pros near Hackettstown, NJ

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Hackettstown, NJ?

Select your specific project to find the pro for you.

TRUSTED BY HACKETTSTOWN, NJ HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon42
    Verified excavation services reviews

Top-Rated Excavation pros in Hackettstown - Updated Nov 2026

BSAN Excavation, LLC
New to Angi
Building Site - Preparation and ClearingExcavation - Major Grading or ReslopingLandscape - Minor Grading or Resloping

Serving Hackettstown, NJ and surrounding areas

Approved

In business since 2024

Free estimates

Credit card accepted

We are committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Response time1 day
Response rate100%
2 neighbors recently requested a quote
Vanwingerden Enterprise
New to Angi
Building Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping - For Business

Serving Hackettstown, NJ and surrounding areas

Approved

In business since 2021

Free estimates

Offers commercial services

Welcome to Vanwingerden Enterprise! We always provide high quality work that produces an exceptional product. We pride ourselves on the relationships we build with all of our clients, and we cannot wait to hear from you. Call today!

...
Showing 1-10 of 122
Excavating FAQs, answered by experts

Concrete blocks are the cheapest way to base a shed. However, the space in between allows critters to go under, burrow, and even damage your shed’s frame. For a more pest-proof option, consider building a shed base with gravel or paver stones. Both options are fairly affordable and easy enough for a DIY project. For gravel, you can build a wooden frame to contain the loose material.

How deep your septic system needs to be into the ground depends on several factors. In extremely cold environments, the tank needs to rest below the maximum frost line, which can be up to six or eight feet deep. The standard burying depth for most systems is between a few inches and four feet below ground level. Depth can also depend on the slope of the landscaping and other property variables. 

In the United States, a depth of 36 inches (three feet) for underground water lines is the accepted industry standard. This depth varies from location to location based on local conditions. In areas with colder winters, they may be buried deeper to prevent frozen well water pipes : This is usually at least six inches below the frost level. The International Plumbing Code calls for a minimum of 12 inches below grade.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

No, a ditch isn’t a trench. A ditch is an open, relatively shallow channel that’s carved out of the ground and used for drainage purposes. In contrast, a trench is a deeper excavation that’s entirely underground. Trenches have many uses, including gas lines, sewage systems, and electrical wiring. Unlike trenches, ditches don’t get filled back in with dirt after they’re dug.

The Hackettstown, NJ homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.