Top-rated basement remodelers.

Get matched with top basement remodelers in Teachey, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Teachey, NC?

Select your specific project to find the pro for you.

Find Basement remodelers in Teachey

Avatar for Bladen Improvement
Bladen Improvement
5.0(
5
)
Basement - Remodel

Serving Teachey, NC and surrounding areas

Free estimates

Credit card accepted

"Top quality work, great prices and extraordinary people! I look forward to working with this Company again, so needless to say, I highly recommend them! Great work, and keep it up."
Remodeling - General Project
Remodeling - General Project
Recommended by100%of homeowners
Avatar for C & J Hunt Construction Services LLC
C & J Hunt Construction Services LLC
4.1(
68
)
Basement - Remodel

Serving Teachey, NC and surrounding areas

In business since 2007

Free estimates

Credit card accepted

"Very knowledgeable and professional owner estimated our remodeling job. Company was  responsive, but pricing was comparatively too high. I will call on this company for new/repair jobs in the future, if needed, because I had a  very good impression of their ability to deliver a high quality product.
"
Bloomfield Garage
Cassata Built-In
Sadler Renovation
Recommended by85%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Teachey, NC and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Craftsman Direct Handyman Home Improvement
Craftsman Direct Handyman Home Improvement
4.1(
321
)
Basement - Remodel

Serving Teachey, NC and surrounding areas

In business since 2002

Free estimates

Credit card accepted

"The first visit was to gather info for a bid on the project including which materials would be needed. The second visit was installation. He was a little late getting here but clearly explained why he was late. The actual work went well, he cleaned up the work area entirely and I am satisfied with the results."
Wood Rot
Tiered Deck
Basement finishing
Call The Boss
Recommended by91%of homeowners
Avatar for Hampton Enterprise LLC
Hampton Enterprise LLC
3.7(
9
)
Basement - Remodel

Serving Teachey, NC and surrounding areas

In business since 1989

Free estimates

Emergency services offered

Our mission at Hampton Enterprise LLC is to provide clients with superior customer service, quality work and speedy service in all aspects of their home improvement needs. Licensed, insured and trusted since 1989; come discover the Hampton difference today!\n\nWe specialize in the installation and repair of Windows, Doors, Flooring, Sinks, Bathtubs, Showers, Sprinkler Systems and much more. We also offer Interior and Exterior Home Painting, Custom Welding Fabrication and Carpentry.Localy in your area just call and i will call back with a local number thank you . from James Hampton\n\nAL.Dothan 334-648-3817,\nAL Birmingham 334-648-3817,\nAL Huntsville 334-648-3817,\nAL Mobile 334-648-3817,\nAL Tuscaloosa 334-648-3817,\nAL Montgomery 334-578-4761,\nAR Little Rock 334-648-3817,\nAZ Phoenix 334-648-3817,\nCA LosAngeles/Sacramento 334-648-3817,\nCO Denver/Colorado Springs 334-648-3817,\nCT Hartford 334-648-3817,\nDE Dover 334-648-3817,\nFL Tallahassee 334-648-3817,\nFL Cape Canaveral/ Cocoa 334-648-3817,\nFL. Destin 334-648-3817,\nFL Gainsville 334-648-3817\nFl Jacksonville 334-648-3817,\nFL Orlando 334-648-3817,\nFL Panama City 334-648-3817,\nFL Tampa 334-648-3817,\nFL Miami 334-648-3817,\nGA Atlanta 334-648-3817,\nGA Albany 334-648-3817,\nGA Augusta 334-648-3817,\nGA Columbus 334-648-3817,\nGA Macon 334-648-3817,\nGA Valdosta 334-648-3817,\nIA Des Moines 334-648-3817,\nID Boise 334-648-3817,\nIL Chicago/Springfield 334-648-3817,\nIN Indianapolis 334-648-3817,\nKS Levenworth/Topeka 334-648-3817,\nKY Frankfort 334-648-3817,\nLA New orleans/Baton Rouge 334-648-3817,\nMA Boston 334-648-3817,\nMD Annapolis 334-648-3817,\nME Augusta 334-648-3817,\nMI Detroit/Lansing 334-648-3817,\nMN Saint Paul 334-648-3817,\nMO kansas City/Jefferson City 334-648-3817,\nMS Jackson 334-648-3817,\nMS Biloxi 334-648-3817,\nMS Gulf Port 334-648-3817,\nMT helena 334-648-3817,\nNC Raleigh 334-648-3817,\nND Bismark 334-648-3817,\nNE Lincoln 334-648-3817, \nNJ Trenton 334-648-3817,\nNM Santa Fe 334-648-3817,\nNV Carson City 334-648-3817,\nNV Las Vegas 334-648-3817\nNY Albany 334-648-3817,\nOH Columbus 334-648-3817,\nOK Oklahoma Ciy 334-648-3817,\nOR Salem 334-648-3817,\nPA harrisburg 334-648-3817,\nRI Providence 334-648-3817,\nSC Columbia 334-648-3817,\nSD Pierre 334-648-3817,\nTN nashville 334-648-3817,\nTX Austin 334-648-3817,\nUT Salt Lake City 334-648-3817,\nVA Richmond 334-648-3817,\nVT montpelier 334-648-3817,\nWI Madison 334-648-3817,\nWV Charleston 334-648-3817,\nWY Cheyenne 334-648-3817

Additional Photos
Additional Photos
Recommended by60%of homeowners
Showing 1-10 of 18
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Permits may be required for major repairs, structural work, or electrical and plumbing restoration after a flood. Check with your local building department to determine permit requirements and associated fees for your flooded basement cleanup project. Obtaining the correct permits helps ensure work is done safely and up to code.

While framing a basement is not as difficult as finishing a basement, it's something you should typically leave to the pros. That’s because if something is installed correctly, it will affect your entire basement. However, you can take care of some of the smaller tasks, like filling holes or putting up some insulation.

For most basement remodels, you’ll want to hire a general contractor. This is for a number of reasons, but the main two are that general contractors have dedicated teams they are comfortable with, and hiring one means you only have to deal with one pro. You may also get a better project quote since they can lump all their work and subcontracting into a single quote. 

It’s less expensive to finish your basement than it is to build an addition to your home. The average cost to refinish a basement is $32,000 (between $7 and $23 per square foot) while building an addition to your home costs $50,325 ($80 to $210 per square foot). Depending on the size of your basement and other factors, like moving plumbing and electrical, refinishing a basement is a more cost-effective option in most cases.

The Teachey, NC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.