Top-rated basement remodelers.

Best basement remodelers near Rose Hill, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Rose Hill, NC?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Rose Hill - Updated Nov 2026

Avatar for Bladen Improvement
Bladen Improvement
5.0(
5
)
Basement - Remodel

Serving Rose Hill, NC and surrounding areas

Free estimates

Credit card accepted

"Top quality work, great prices and extraordinary people! I look forward to working with this Company again, so needless to say, I highly recommend them! Great work, and keep it up."
Remodeling - General Project
Remodeling - General Project
Recommended by100%of homeowners
Avatar for C & J Hunt Construction Services LLC
C & J Hunt Construction Services LLC
4.1(
68
)
Basement - Remodel

Serving Rose Hill, NC and surrounding areas

In business since 2007

Free estimates

Credit card accepted

"Very knowledgeable and professional owner estimated our remodeling job. Company was  responsive, but pricing was comparatively too high. I will call on this company for new/repair jobs in the future, if needed, because I had a  very good impression of their ability to deliver a high quality product.
"
Bloomfield Garage
Cassata Built-In
Sadler Renovation
Recommended by85%of homeowners
Avatar for Future Overseas, LLC
Future Overseas, LLC
5.0(
6
)
Basement - Remodel

Serving Rose Hill, NC and surrounding areas

Emergency services offered

"They professionally hung two large TVs to the wall. Very efficient. Very skilled. Would hire again in a second. They also bind a medicine cabinet in the bathroom … pro!"
Sunrooms and Patio Enclosures Project
Handyman Services Project
General Remodeling Project
Painting - Interior Project
Sunrooms and Patio Enclosures Project

+18

Response time3 days
Response rate100%
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Rose Hill, NC and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Craftsman Direct Handyman Home Improvement
Craftsman Direct Handyman Home Improvement
4.1(
321
)
Basement - Remodel

Serving Rose Hill, NC and surrounding areas

In business since 2002

Free estimates

Credit card accepted

"I contacted three different providers to give quotes on adding a 12'x16' deck extension to the existing deck. This would be about 1.5 feet off the ground and covering an existing concrete slab. Craftsman contacted me and scheduled Kevin H. to come out to perform the estimate and he did so on 08-Jun-2015. Kevin's demeanor was professional and he seemed knowledgeable and focused on providing what I wanted. We received the estimate from him 3 days later for $3300-$4000 labor and $750 materials. We were told at that time that scheduling was 1-2 weeks out. While Craftsman was the highest bid, we decided to go with them because they seemed knowledgeable and slightly more "polished" than the other potential contractors, and one of the important factors for us was that they could start work in 1-2 weeks as we were eager to get the deck finished so we could do some other projects around the deck. 
On 14-Jun-2015 we sent the email accepting the proposal and on 15-Jun-2015 Kevin confirmed receipt and stated Laura would send over the contract to sign and schedule us. He re-affirmed that we were 1-2 weeks out on the schedule. Later that day, I received a follow-up email from Kevin informing me that the engineering plan they would work from is my responsibility and provided me with the name of an engineer and told me I will pay the engineer directly. This was the first time that I was told I had to separately contract, schedule, and pay for additional services outside of the bid. I was told at this time we would hold off on the contract until the engineer came out and provided a more concrete plan so the contract could be more accurate. I was assured at that time that we would keep our place in schedule so we didn't go to the end of the line. We weren't happy with this development but moved forward. 
I contacted the engineer (which I am not sure that was needed for such a small deck project) and he agreed to come to the house and meet me on 16-Jun-2015. He arrived on time and gathered the information for the engineer plan. He indicated that the plan would be to me on 18-Jun-2015. When I didn't receive it by 22-Jun-2015 I contacted him and he said he was finishing it up and would send that day. I later that day received an invoice and was told that I couldn't have the sealed plan until I paid the invoice. I paid the $210 and on 23-Jun-2015 finally had an engineer plan which was shared with Kevin. 
Finally on 01-Jul-2015 I received a contract to sign. The contract included $3,358 in labor and an estimated materials of $850 (a minor increase of $100, but certainly acceptable as the first was done without the engineering plan). It is worth noting that one of the reasons I went with this highest bid was because of their scheduling estimates which were to begin work within 1-2 weeks. At this point we are at 2 weeks + 2 days.
Kevin confirmed some information and informed me that he would order materials and have them delivered to the house and that work would begin on Wednesday, 08-Jul-2015. I scheduled to be home from work that day. On Tuesday I was informed that they were running long on another job and wouldn't start until Thursday. On Wednesday I was informed that the materials couldn't be delivered until Friday, so work wouldn't begin until Monday, 13-Jul-2015. We are now beginning work 2 days shy of 4 weeks after accepting the bid, nearly double the time we were told when we chose them over the others.
On 13-Jul-2015, two sub-contractors arrived to begin work, Mike and Steve. They worked through the day and realized they needed a few more materials than were ordered. They came back and worked the next two days and we had the basic work complete. They had another job to do on Thursday, which was fine and then worked again on Friday and ordered more composite as there wasn't enough to complete. They worked again on Monday for a bit and then came back on Tuesday once additional trim was received. The composite was completed on Wednesday morning. 
At some point about half way through the work, I was informed that the materials were going to cost more than estimated. It wasn't a 20% overrun like I would expect. The materials were completely mis-estimated and instead of the $850 that was in the contract, materials were going to run over $2000. At first it was presented to me as though I misread the contract and that these costs were in there, just not spelled out as clearly as they should have been. When I stated this wasn't so and asked that I be shown where in the contract, it was acquiesced that Kevin had simply "messed up" in creating the initial estimate. He stated that this was only the second deck he had done an estimate for, which was a surprise given that during the bid process we were led to believe there was decades of experience going into this process. 
So, on 22-Jul-2015, we had a finished extension to our deck. The final bill was $5663.00, which included $2175 in materials vs. the $850 we agreed to when we signed the contract. We paid Kevin and the transaction was complete. It was another 5 days before the 'bagster' service picked up the bag on our lawn that had all the trash and scrap materials. An unfortunate note on this is that instead of putting this bag on the driveway, where there was ample space to do so, they put it on the grass. several weeks of that bag on grass ended up that my front yard now has a 5'x8' spot of "dead" in the middle of it. That was poor planning on the part of whomever decided that would be where that bag was placed (picture of the dead spot below as well).
I thing or two that I want to note on this review. I tried to give an honest account of how it went. It isn't an indictment of the people involved. Kevin was extremely nice and professional and he was apologetic for the errors in estimating the materials and the delays. Mike and Steve, the guys doing the actual work, were outstanding, professional and did a GREAT job on the deck. We couldn't be happier with the final product (pictures below).
"
Wood Rot
Tiered Deck
Basement finishing
Call The Boss
Recommended by91%of homeowners
Avatar for Hampton Enterprise LLC
Hampton Enterprise LLC
3.7(
9
)
Basement - Remodel

Serving Rose Hill, NC and surrounding areas

In business since 1989

Free estimates

Emergency services offered

Our mission at Hampton Enterprise LLC is to provide clients with superior customer service, quality work and speedy service in all aspects of their home improvement needs. Licensed, insured and trusted since 1989; come discover the Hampton difference today!\n\nWe specialize in the installation and repair of Windows, Doors, Flooring, Sinks, Bathtubs, Showers, Sprinkler Systems and much more. We also offer Interior and Exterior Home Painting, Custom Welding Fabrication and Carpentry.Localy in your area just call and i will call back with a local number thank you . from James Hampton\n\nAL.Dothan 334-648-3817,\nAL Birmingham 334-648-3817,\nAL Huntsville 334-648-3817,\nAL Mobile 334-648-3817,\nAL Tuscaloosa 334-648-3817,\nAL Montgomery 334-578-4761,\nAR Little Rock 334-648-3817,\nAZ Phoenix 334-648-3817,\nCA LosAngeles/Sacramento 334-648-3817,\nCO Denver/Colorado Springs 334-648-3817,\nCT Hartford 334-648-3817,\nDE Dover 334-648-3817,\nFL Tallahassee 334-648-3817,\nFL Cape Canaveral/ Cocoa 334-648-3817,\nFL. Destin 334-648-3817,\nFL Gainsville 334-648-3817\nFl Jacksonville 334-648-3817,\nFL Orlando 334-648-3817,\nFL Panama City 334-648-3817,\nFL Tampa 334-648-3817,\nFL Miami 334-648-3817,\nGA Atlanta 334-648-3817,\nGA Albany 334-648-3817,\nGA Augusta 334-648-3817,\nGA Columbus 334-648-3817,\nGA Macon 334-648-3817,\nGA Valdosta 334-648-3817,\nIA Des Moines 334-648-3817,\nID Boise 334-648-3817,\nIL Chicago/Springfield 334-648-3817,\nIN Indianapolis 334-648-3817,\nKS Levenworth/Topeka 334-648-3817,\nKY Frankfort 334-648-3817,\nLA New orleans/Baton Rouge 334-648-3817,\nMA Boston 334-648-3817,\nMD Annapolis 334-648-3817,\nME Augusta 334-648-3817,\nMI Detroit/Lansing 334-648-3817,\nMN Saint Paul 334-648-3817,\nMO kansas City/Jefferson City 334-648-3817,\nMS Jackson 334-648-3817,\nMS Biloxi 334-648-3817,\nMS Gulf Port 334-648-3817,\nMT helena 334-648-3817,\nNC Raleigh 334-648-3817,\nND Bismark 334-648-3817,\nNE Lincoln 334-648-3817, \nNJ Trenton 334-648-3817,\nNM Santa Fe 334-648-3817,\nNV Carson City 334-648-3817,\nNV Las Vegas 334-648-3817\nNY Albany 334-648-3817,\nOH Columbus 334-648-3817,\nOK Oklahoma Ciy 334-648-3817,\nOR Salem 334-648-3817,\nPA harrisburg 334-648-3817,\nRI Providence 334-648-3817,\nSC Columbia 334-648-3817,\nSD Pierre 334-648-3817,\nTN nashville 334-648-3817,\nTX Austin 334-648-3817,\nUT Salt Lake City 334-648-3817,\nVA Richmond 334-648-3817,\nVT montpelier 334-648-3817,\nWI Madison 334-648-3817,\nWV Charleston 334-648-3817,\nWY Cheyenne 334-648-3817

Additional Photos
Additional Photos
Recommended by60%of homeowners
Showing 1-10 of 21
Basement Remodel FAQs, answered by experts

It is common for a contractor to ask for a down payment before starting a project, especially for jobs that require purchasing materials and equipment or hiring a crew. The deposit amount can range from 10% to 50% of the total job cost. While a request for up to 50% is not unusual, a contractor should not ask for more than that, and you should never pay for a project in full before the work has begun. To protect yourself, always discuss payment terms before starting and have a written contract that outlines the project timeline and expectations. Additionally, be sure to hire reputable contractors and check their licensing and insurance before the project begins.

It is generally more affordable to finish a basement than an attic, though it ultimately depends on how you plan to use the space. The average cost to finish a basement ranges from $7 to $23 per square foot, while attic renovation costs $30 to $60 per square foot. However, a simple attic conversion to a storage space will cost significantly less.

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

Unless you have extensive experience in construction work, remodeling a basement is best left to a professional. There are several tasks associated with this project that require exact precision, including:

  • Replacing insulation 

  • Replacing carpet or other flooring 

  • Adding heating and cooling

  • Adjusting or adding walls and doors

  • Altering or adding plumbing elements

If any of these elements is done incorrectly, it could severely impact the quality of your basement remodel and be dangerous. Changing a basement often comes with code safety requirements, like egress windows and proper ventilation. Therefore, leaving it up to a professional is often the best decision.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Rose Hill, NC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.