Top-rated basement remodelers.

Get matched with top basement remodelers in Beulaville, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Beulaville, NC?

Select your specific project to find the pro for you.

Find Basement remodelers in Beulaville

Avatar for Calypso Woodworks
Calypso Woodworks
5.0(
12
)
Basement - Remodel

Serving Beulaville, NC and surrounding areas

In business since 2022

Free estimates

Credit card accepted

"Awesome work for a reasonable price. Mason and Tony were communicative and prompt with all services rendered. A larger company quoted me 5 days to complete the remodel in my house but Calypso got it done in half that time and followed up with me after. Can't recommend enough. Thanks guys!"
Punch bag
Gym
Custom banquet table 10 feet long
k
Gym

+46

Response time9 hrs
Response rate100%
Recommended by100%of homeowners
Avatar for Bladen Improvement
Bladen Improvement
5.0(
5
)
Basement - Remodel

Serving Beulaville, NC and surrounding areas

Free estimates

Credit card accepted

"Top quality work, great prices and extraordinary people! I look forward to working with this Company again, so needless to say, I highly recommend them! Great work, and keep it up."
Remodeling - General Project
Remodeling - General Project
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Beulaville, NC and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 21
Basement Remodel questions, answered by experts

You can paint your ceiling or install a drywall ceiling if the ceiling is unfinished, as they take up less headroom than drop ceilings. 

If there are pipes in the way of ceiling installation, you can do one of two things: reroute the pipes or adjust the installation to fit, which will cost extra.

While framing a basement is not as difficult as finishing a basement, it's something you should typically leave to the pros. That’s because if something is installed correctly, it will affect your entire basement. However, you can take care of some of the smaller tasks, like filling holes or putting up some insulation.

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

The cost of finishing a basement is about $18,400 on average. As you can see, the framing portion of this project costs less, because you’re essentially just dealing with laying the foundation for a finished basement. The finishing portion of the project involves a lot more intricate work and design, as well as high-end materials.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Beulaville, NC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.