Top-rated basement remodelers.

Get matched with top basement remodelers in Shallotte, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Shallotte, NC?

Select your specific project to find the pro for you.

Find Basement remodelers in Shallotte

Avatar for MA Design & Construction Co
MA Design & Construction Co
4.7(
354
)
Basement - Remodel

Serving Shallotte, NC and surrounding areas

In business since 1999

Free estimates

Emergency services offered

"I hired MA Design and Construction Co to do my bathroom remodel at the recommendation of a friend who also used them for a bathroom/kitchen remodel, and I would definitely hire them again. Not only did they finish right on schedule, but they understood my desire to stay within budget, and never tried to pressure me to overspend or increase costs. They did not start construction until all of the materials were in hand, or in stock, which made the renovation go even smoother. I also had some plumbing issues arise (old valves that needed replacing) which they were able to replace without adding time to the schedule. Marc, Raquel, and team were great and very responsive. Raquel’s design suggestions were really helpful to me, as I wasn’t 100% sure what would look good in a small bathroom. I would definitely recommend their work!"
141 Hayden Rowe Street, Hopkinton MA
Cedar Street_Holliston
Jordan Road_Hopkington
Bathroom Renovation_Dedham
Elliot Road_Sudbury

+504

Recommended by93%of homeowners
Avatar for Quality Solutions
Quality Solutions
4.7(
23
)
Basement - Remodel

Serving Shallotte, NC and surrounding areas

In business since 2007

Free estimates

Emergency services offered

"Don was very professional and efficient! The quality of work he does is excellent at a good price. I will hire him again for any of my roofing, fencing or remodeling needs and I highly reccommend him for all your needs."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+22

Recommended by95%of homeowners
Avatar for Those Flipping Woodards LLC
Those Flipping Woodards LLC
4.6(
9
)
Basement - Remodel

Serving Shallotte, NC and surrounding areas

In business since 2017

Credit card accepted

"Could not be happier with the result! So excited for my new bathroom! Tim did an excellent job! He is very reliable, talented, honest, and was up front with pricing. He is a very kind person and felt very comfortable having him in my home. I would definitely recommend Tim! Looking forward to hopefully renovating the kitchen next with him!"
Remodeling - Kitchen & Bathroom Project
Kitchen and Bath Remodeling Project
Kitchen and Bath Remodeling Project
Additional Photos
Additional Photos

+19

Response time1 day
Response rate100%
Recommended by88%of homeowners
Avatar for Bladen Improvement
Bladen Improvement
5.0(
5
)
Basement - Remodel

Serving Shallotte, NC and surrounding areas

Free estimates

Credit card accepted

"My new floor looks amazing! The staff was very informative about what to choose and expect with the floor I wanted. They were efficient, courteous, and they made certain to cleanup upon completion. I will definitely call them again when I’m ready to do my next room remodel."
Remodeling - General Project
Remodeling - General Project
Recommended by100%of homeowners
J&M Custom Home Improvement
5.0(
8
)
Basement - Remodel

Serving Shallotte, NC and surrounding areas

In business since 2014

Free estimates

Emergency services offered

"I am so so happy with the outcome, it is beautiful! I was picky with my finishings, but this crew knew exactly what I was looking for in my remodel. They are the ONLY people I will ever call if I need more work done. My home looks like an image from a magazine, and I'm happy being home enjoying my new remodels.. I love it.. Thank You so so much guys!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+16

Recommended by100%of homeowners
Showing 1-10 of 41
Basement Remodel questions, answered by experts

The best type of basement ventilation system depends on your budget, the moisture in your basement’s air, and the types of windows you have down there. You should consider all of these factors when choosing a ventilation system. However, the most effective method for basement ventilation is an energy recovery ventilator (ERV) or a whole-house ventilation system, which preheats or precools incoming air from the outside while also managing water vapor.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Any bowing in a basement wall indicates a problem that needs to be addressed by a professional. If your basement wall bows more than 1 inch, it's time for an inspection. Generally, a wall can bow up to 30% of its thickness (around 2.5 inches for an 8-inch-thick wall) before it becomes an urgent situation. Bowing of 2 to 4 inches is more straightforward to fix than bowing of more than 4 inches, which will require significant repairs. If the bowing is more than 6 inches, the wall will likely need to be replaced. The sooner you address the problem, the easier and less expensive the repair will be.

Costs are guided by renovation scope, materials chosen, project duration, structural needs, and labor. Prioritizing tasks prevents unforeseen expenses.

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

The Shallotte, NC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.