Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Lenoir, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Lenoir, NC?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Lenoir

Avatar for Painting for You
Painting for You
5.0(
10
)
Concrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Lenoir, NC and surrounding areas

Approved

In business since 2007

Free estimates

Offers commercial services

"The owner of Painting For You LLC is Elias Acevedo. His group did considerable wood repairs and painted the entire house. They also replaced a long gutter over the garage that was falling apart. My wife and I were very happy with the quality and effort they extended in completing this job. The price they quoted was very fair."
Blue ridge mountain club
Blue ridge mountain club
Blue ridge mountain club
Blue ridge mountain club
Blue ridge mountain club

+28

Response time4 hrs
Recommended by100%of homeowners
...
Showing 1-10 of 60
Epoxy Flooring questions, answered by experts

Flooring professionals can typically apply epoxy within one or two days, depending on how much preparation or repair the old floor needs before application. However, you’ll need to wait after the application is complete to use the flooring. While you can walk on the epoxy flooring before it fully cures, it can take up to 72 hours for the epoxy floor to fully dry and be ready for full use.

Costs depend on coating type, labor, site preparation, and required finishes.

Yes, with textures, colors, and finishes available to match décor.

Yes, professionals offer slip-resistant options for added workplace safety.

Yes, you can seal old or existing concrete, but proper preparation is crucial. The concrete surface must be clean, dry, and free of any incompatible old sealant. To check if an old sealer is present, drip a few drops of water onto the surface; if the water is absorbed in under five minutes, it's ready to be resealed. If you plan to use the same type of sealer that was previously applied, you may not need to remove the old layer. However, if you are using a different type of sealer, the old one must be completely removed. Before applying the new sealer, thoroughly clean the concrete and repair or fill any cracks to ensure a smooth, well-prepared surface.

The Lenoir, NC homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.