Top-rated basement remodelers.

Get matched with top basement remodelers in Ellenboro, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Ellenboro, NC?

Select your specific project to find the pro for you.

Find Basement remodelers in Ellenboro

Avatar for Chivous Dwayne Suttle
Chivous Dwayne Suttle
4.8(
6
)
Basement - Remodel

Serving Ellenboro, NC and surrounding areas

In business since 2010

Free estimates

Warranties offered

"I needed a ton of work done and they completed it all ! They went above and beyond my expectations. I was informed and updated through the entire process and was given options to choose from and really customized everything to make it exactly like I wanted. The whole crew was extremely nice, polite and worked really hard. Iâ ll definitely use them again for my upcoming project!"
past work
past work
past projects
past projects
past projects

+1

Response time1 day
Response rate94%
Recommended by66%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Ellenboro, NC and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
JC Remodeling
5.0(
2
)
Basement - Remodel

Serving Ellenboro, NC and surrounding areas

In business since 2024

Free estimates

Emergency services offered

"They were quick to respond and prompt to schedule the job and show up to perform it. They did a terrific job painting a bathroom after cleaning the mildew we struggled to get rid of, so we then hired them again to paint a bedroom. Their cost was reasonable after some negotiating. We were very pleased Overall."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+20

Recommended by100%of homeowners
Avatar for A to Z Contracting
A to Z Contracting
3.5(
11
)
Basement - Remodel

Serving Ellenboro, NC and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"Not too good ! The workers were good . The owner Matt promised that the work would be completed in 2 weeks still not done as of today 01/13/2024 ,it has been one excuse after another on 11/22/24 needed to install the new shutters, he promised and gave his word and a hand shake , so we paid in full on 11/22/24 , cause we were going out of town for a bit , thought I was doing good but it has hit me hard , still not done as of today 1/13/24 . Numerous lies , he said we will get them this week , and was told on 4 ( Tex messages)different occasions that the shutters were either delivered or had picked them up . Also the main reason we went with a metal roof we had a roof leak and wanted it stopped it was on our back porch in the center of the back door , it leaks worse now than ever before , was also promised that it would be fixed (not fixed ).1 light fixture not fixed .asked for 6” gutters got 5” I am ok with the 5”gutters, and only got 6 down spouts asked and paid for 8 down spouts (have 8 points or the house , need 1 down spout per point .the siding looks good except the light fixture and outside water spicket should have new mounting blocks, they have the old ones still that do not match . ( 1 is broken 2 don’t have one ).2 places on the front porch needs to be fixed where it all should be wrapped in black metal it look bad. I don’t like being lied too and taken advantage of , all I wanted was to get this work done and not cut corners, for the money I paid it should have been done more professionally."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

Recommended by60%of homeowners
Showing 1-10 of 32
Basement Remodel questions, answered by experts

Yes, in most cases, finishing a basement is worth the cost. The project adds valuable, usable square footage to your home and typically provides a return on investment (ROI) of 70% to 75%. For example, an average basement refinishing project costing $32,000 could add between $22,400 and $24,000 to your property's value. The final value added depends on factors like your location, the quality of materials and workmanship, and the features you include, such as a living space, bedroom, or bathroom. To be officially counted in your home's total square footage, the finished space must comply with all local building codes, including requirements for points of egress. However, in areas prone to flooding, a finished basement might be seen as a liability by potential buyers and could potentially decrease your home's value.

Building a bar in the basement will likely add value to your home, although it’s unlikely that you’ll see a significant return on investment (ROI) unless you plan on using the space for you and your guests. If you think you’ll use the area frequently, though, it’s probably worth the investment, and you should see a bump in value if or when you sell your property.

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Ellenboro, NC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.