Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Ararat, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Ararat, NC?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Ararat

Avatar for Tycoon Sealcoating LLC
Tycoon Sealcoating LLC
5.0(
3
)

Serving Ararat, NC and surrounding areas

Approved

In business since 2024

Free estimates

Credit card accepted

"I couldn?t be happier w/ the work Tycoon Asphalt did on our driveway. From the first phone call to the finished project, the team was professional, honest, and incredibly detail oriented. They arrived on time, explained the entire process, and delivered exactly what they promised. The driveway looks brand new, and the quality of the workmanship really stands out. If you?re looking for a reliable asphalt company that takes pride in their work, I highly recommend Tycoon Asphalt. We?ll definitely be using them again for future projects!"
12 neighbors recently requested a quote
Quality paving
New to Angi

Serving Ararat, NC and surrounding areas

Approved

Transforming tired asphalt into the neighborhood’s cleanest curb appeal. We specialize in high-grade sealcoating that doesn’t just look like a new driveway it protects your investment against the elements for years to come. Precision application, professional finish, zero shortcuts."Giving your driveway a second life”. Professional sealcoating to protect, preserve, and polish. Locally owned, detail-obsessed. Your asphalt’s best friend. Stop the cracks before they start. We provide honest, high-quality sealcoating for homeowners who take pride in their property. We treat every driveway like it’s our own—tougher than the weather and smoother than the day it was poured CALL 681-474-1830

Avatar for RidgeView Grading & Excavating
RidgeView Grading & Excavating
5.0(
1
)

Serving Ararat, NC and surrounding areas

Approved

Free estimates

Offers commercial services

"Ryland developed a plan to overcome a multi year erosion problem that was aggravated by installation of a Generac system and the burying of a 250 gallon LP tank in my front yard. Ryland executed the plan in two days. Within 20 minutes of completion, he design was tested and found to be successful by a significant downpour."
Logo
My jobs
My jobs
My jobs
My jobs

+3

4 neighbors recently requested a quote
Broadie Elite Asphalt & Striping LLC
New to Angi

Serving Ararat, NC and surrounding areas

Approved

At Broadie Elite Asphalt & Striping LLC, we specialize in high-quality parking lot striping, sealcoating, and asphalt repairs for commercial properties. Our focus is on delivering clean, precise work that enhances safety, appearance, and long-term pavement performance. We take pride in reliability, attention to detail, and treating every property as if it were our own.

22 neighbors recently requested a quote
...
Showing 1-10 of 144
Asphalt Driveways questions, answered by experts

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

The decision to repair or replace your driveway depends on the extent of the damage. If your driveway has a few small cracks, a simple repair will do the trick. If you see larger cracks and potholes, it may be time to consider resurfacing or replacement. Resurfacing is a great option if more than 25% of the surface is damaged, but if the damage is extensive—deep cracks or significant sinking—it’s best to replace the driveway entirely. A new driveway, with proper care, can last decades while patching or resurfacing might only hold up for a few years before needing more attention.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Three inches is a great thickness for a residential asphalt driveway that sees minimal to moderate traffic from cars, SUVs, and pickup trucks. However, a thicker driveway can better withstand the weight of a heavier vehicle, such as a trailer or a recreational vehicle. If you drive a heavy vehicle on a thin driveway, you risk cracking and damaging it.

Yes, with colored finishes and decorative stamping for a personalized touch.

The Ararat, NC homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.