Top-rated subcontractors.

Get matched with top subcontractors in Kiln, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Kiln, MS?

Select your specific project to find the pro for you.

TRUSTED BY KILN, MS HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon472
    Verified subcontracting services reviews

Find Subcontractors in Kiln

Avatar for Country Remodeling and Renovation LLC
Country Remodeling and Renovation LLC
5.0(
6
)
Major Home Repairs (General Contractor)

Serving Kiln, MS and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

"Dakota and his team were very professional and did a great job repairing a wall and a ceiling. Dakota was very quick to communicate and return calls. Ive had bad experiences with contractors in the past and given how hard it is to find a good one I would definitely go back to country remodeling."
2 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for The Quick Fix
The Quick Fix
5.0(
10
)
Major Home Repairs (General Contractor)

Serving Kiln, MS and surrounding areas

In business since 2021

Emergency services offered

"Found Destre on Angi after another contractor came out and completely botched the job. Wanted to replace the weather stripping around rear patio door. The previous contractor ruined the bottom seal on the door and left us with a/c escaping and the flys and mosquitoes coming in. Called and spoke to Destre and he came out within an hour. Surveyed the damage and was off to Home Depot to get replacement parts. Could not find but resourcefully found a clear plastic one. Installed and all has been fine ever since. In speaking with Destre learned his experience in all types of home repair. The thing I liked best is he commented “I will not stop working until the job is completed to your satisfaction”. I paid his quoted price and added a generous tip for his diligence and great attitude. I have finally found my home repairman."
Additional Photos
Recommended by100%of homeowners
...
Showing 1-10 of 84
Subcontractors questions, answered by experts

A floor plan is a less detailed illustration showing a building or room's layout from above, including elements like windows, doors, walls, and fixtures. It offers a simplified view for homeowners. In contrast, a blueprint is a more detailed, to-scale architectural drawing that includes all parts of the building plans, such as structural elements, construction details, and utility schematics. While a floor plan can be a type of view within a blueprint, the complete blueprint contains all the necessary details to turn the plan into a reality.

Custom homes can take an average of 18 months to build, mainly due to the lengthy design process, and most projects take somewhere between 12 and 24 months. When you work with the right custom home builders near you, they can help you map the road ahead and understand what can speed up or delay the timeline. Choosing locally available materials, for example, can speed things up without losing that customized touch.

Mid-century modern architecture was a popular home style throughout the U.S. from the 1950s to 1970s. Most homes feature a wide and symmetrical floor plan with low-sloped roofs and floor-to-ceiling windows. Its minimalism and balanced appearance are back on the home style scene, particularly when maximizing sunlight, airflow, and a blend with the home's natural surroundings.

The best way to start designing a house is to know what you want before designing. Making a list of your biggest priorities in a home will help. Designing a house without an idea of what you need or want in a home will lead to many trials and errors that could make it harder to figure out what you need in your design.

It is technically possible to draw your own blueprints, but the process is extremely involved and really demands help from an expert. A professional architect has an understanding of design elements, interior design, the functionality of different rooms in a home, and how everything from furniture, outlets, and light switches should be laid out to serve you and your family best. Hiring an architect for blueprints can get expensive, but it’s the most responsible way to begin a new construction project. If you’re keen on DIYing, you could consider starting the process and then having a professional take over.

The Kiln, MS homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.