Top-rated concrete mudjacking pros.

Best concrete mudjacking pros near Itta Bena, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Itta Bena, MS?

Select your specific project to find the pro for you.

Top-Rated Concrete mudjacking pros in Itta Bena - Updated Nov 2026

D's Concrete Works
New to Angi
Concrete - Injection Leveling - Mudjacking

Serving Itta Bena, MS and surrounding areas

In business since 2001

D's Concrete Works has over 19 years experience in the field. We pride ourselves on striving to complete your project on schedule and work hard to get the quality you need the first time around. D's Concrete Works provides free estimates. We also want you to know that our project motto is- "Big or Small we do them all!" D's Concrete Works looks forward to meeting with you and assisting with each and every concrete project you have for your home.

Concrete Mudjacking FAQs, answered by experts

Mudjacking restores level surfaces, prevents further damage, and is more cost-effective than a full replacement.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

Address drainage issues, avoid heavy loads, and seal cracks to prevent future settling.

Most houses are expected to settle over time, but foundation sinking of more than a few inches or uneven sinking of more than an inch for every 20 feet is cause for concern. Any significant or uneven sinking should be assessed by a professional to determine the cause and perform any necessary repairs. 

Most projects take 1-3 hours, with immediate usability after completion.

The Itta Bena, MS homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.