Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Greenwood, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Greenwood, MS?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Greenwood

D's Concrete Works
New to Angi
Concrete - Injection Leveling - Mudjacking

Serving Greenwood, MS and surrounding areas

In business since 2001

D's Concrete Works has over 19 years experience in the field. We pride ourselves on striving to complete your project on schedule and work hard to get the quality you need the first time around. D's Concrete Works provides free estimates. We also want you to know that our project motto is- "Big or Small we do them all!" D's Concrete Works looks forward to meeting with you and assisting with each and every concrete project you have for your home.

Concrete Mudjacking questions, answered by experts

Mudjacking can be an expensive foundation repair process, but in many cases, it’s well worth the investment. This is especially true if you’re lifting a portion of sunken foundation slab back into place. In that case, mudjacking can help avoid major structural damage and even home collapse by restoring the integrity of your structure with minimally invasive procedures. Mudjacking a concrete patio, walkway, or sidewalk can be worthwhile because it removes tripping hazards and makes your outdoor area more aesthetically appealing.

The polyurethane used for polyjacking will expand and cure in 15 to 30 minutes. After that point, your slab will be safe to walk on and even drive on in the case of a sidewalk or concrete driveway. Double-check with your concrete lifting specialist to confirm a curing timeline, as products can differ.

Yes, you can mudjack cracked concrete, but the cracks will need to be repaired once the concrete has been leveled. If the concrete is severely cracked in multiple places, replacement may be a better option, but for less severe cracking, mudjacking is a good solution as long as cracks are correctly caulked and sealed.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Address drainage issues, avoid heavy loads, and seal cracks to prevent future settling.

The Greenwood, MS homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.