Top-rated excavation pros.

Get matched with top excavation pros in De Kalb, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in De Kalb, MS?

Select your specific project to find the pro for you.

Find Excavation pros in De Kalb

Red Clay Construction
New to Angi
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For Business

Serving De Kalb, MS and surrounding areas

Approved

In business since 2022

Credit card accepted

We take great pride in offering the best possible experience with our expertise, quality, and customer service. In order to understand the needs and expectations of our clients; we take great care to work and communicate with everyone in a professional manner. It is our mission to exceed our clients expectations by providing excellent workmanship and complete customer satisfaction, from the start of each project to its completion. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Building preparation/ House pad
Pond Construction
Pond, House, MS
Pond, House, MS
Starkville house pad

+1

Response time20 mins
Avatar for J And B Equipment, LLC
J And B Equipment, LLC
3.0(
2
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving De Kalb, MS and surrounding areas

In business since 2014

Free estimates

Credit card accepted

"Wonderful. We had a contractor do us wrong on our roof two years ago. Jonathan and Brandy took the tin off and rebuilt all the braces and fixed it perfect. He and his crew did a wonderful job at a great price. I will call him for anything I need. He does great quality work."
Clean up after storm
Driveway
Clean up after storm
Recommended by50%of homeowners
Showing 1-10 of 42
Excavating questions, answered by experts

Water lines are buried at various depths, depending on the type of line. For example, most sprinkler lines are buried between four and 12 inches underground. On the other hand, water mains usually sit between one and 3 feet below ground. However, they can go even deeper in cold climates to prevent freezing.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

Chipmunks dig their burrows about three feet deep and up to 30 feet long. The entrances can be two inches wide or more. Chipmunks are fiercely protective of their burrows and use them to protect the nuts and seeds they gather for the long winters.

Consultation with the local government helps identify necessary permits, avoid project delays or legal issues, and protect project integrity.

Errors in site preparation can lead to structural failures or appear costly midway. Professionals ensure detailed, reliable home base development layouts.

The De Kalb, MS homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.