Top-rated excavation pros.

Get matched with top excavation pros in Brooksville, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Brooksville, MS?

Select your specific project to find the pro for you.

Find Excavation pros in Brooksville

Avatar for Nailed It, LLC
Nailed It, LLC
5.0(
6
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Brooksville, MS and surrounding areas

In business since 2019

Free estimates

Credit card accepted

"Mike did a great job! I have been looking for an all around handyman to fix and install things around a property that I own. I'm glad I found Mike. He has already done two jobs for me. He is flexible schedule-wise and very responsive to texts and calls. His prices are not the lowest but they are reasonable. Very friendly and polite to me and my tenants and he can do a lot of different types of work. I highly recommend him as a general contractor/handyman."
Additional Photos
Recommended by100%of homeowners
Showing 1-10 of 40
Excavating questions, answered by experts

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

If you’re planning to dig on your property, you’ll need to check for underground utility lines. Call the national call-before-you-dig 811 number. Once connected to an operator, you can schedule a site visit to mark underground lines. This way, you won’t accidentally dig into pipes and can cause major (read: costly) issues.

Preparation involves site assessment, clearing debris, grading surfaces, and compacting soil to support stable construction.

Trenches are typically 12 to 24 inches deep and 8 inches wide. However, the required depth depends on the specific project and local ordinances. For example, a French drain may need to be 18 inches deep, while a water pipe might require a depth of 24 inches and a drainage pipe 36 inches. Your city or county may have specific regulations, so it's wise to consult with an excavation professional to determine the correct depth for your project.

Directional drilling is complex and requires training to use the advanced machinery. It can be challenging to monitor the position of the drill since there’s no direct line of sight. Directional drilling can also be more expensive with a cost of $10 to $30 per linear foot compared to $5 to $12 per linear foot for trenching. 

The Brooksville, MS homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.