Top-rated cabinet contractors.

Best cabinet contractors near Brandon, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your cabinet contracting project in Brandon, MS?

Select your specific project to find the pro for you.

TRUSTED BY BRANDON, MS HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon47
    Verified cabinet contracting reviews

Top-Rated Cabinet contractors in Brandon - Updated Nov 2026

Avatar for McNair Finishing
McNair Finishing
New to Angi
Cabinets - RepairCustom Cabinets - Build

Serving Brandon, MS and surrounding areas

Approved

In business since 2022

Credit card accepted

We're a locally owned and operated company with over 12 years of industry experience. We value honesty and integrity, and stand behind our work. We specialize in cabinetry installation, custom closets, interior trim and decorative molding installation, built-in furniture, and a variety of related projects. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building long-term relationships with our clients and guarantee your satisfaction! \n \n

Response time4 hrs
...
Showing 1-10 of 145
Cabinet Contractors FAQs, answered by experts

Make sure your shelves are no more than 12 inches deep. Any deeper and it will become hard to access items towards the back of the shelf. Yet, for larger walk-in pantries, homeowners may prefer 15- to 18-inch shelving to make room for larger appliances and cookware.

Many cabinets use “J-pulls” or other handless designs. However, frequent use also gets these areas very dirty over time. A simple household cleaner and a soft washing cloth is usually enough to clean these areas when grime builds up. Adding a layer of lemon oil or beeswax can help prevent finishes from wearing off.

Whether you install flooring before or after kitchen cabinets depends primarily on the type of flooring you are using. For materials like hardwood, tile, and sheet flooring, the best practice is to install the flooring first. This ensures the cabinets are installed at the correct height and on a stable surface. However, you should not install cabinets on top of floating floors, such as laminate or luxury vinyl plank (LVP). These types of flooring need room to expand and contract with temperature and humidity changes. Placing heavy cabinets on top can restrict this movement, potentially causing the floor to buckle and making the cabinets unstable. For floating floors, install the cabinets first and then lay the flooring up to them. Other reasons to consider installing cabinets before the flooring include saving money on materials (since you won't need flooring under the cabinets) and avoiding potential damage to your new floor during cabinet installation. Additionally, installing cabinets directly on the subfloor might prevent voiding your flooring's warranty.

It depends on whether you buy pre-made stacked cabinets or construct them from scratch. If you build added cabinets from scratch, you can expect it to take several hours or days to build each one and then another two to three days for installation. Then, after painting your new cabinets, you should allow a few weeks for the paint to dry thoroughly before installing them over your existing cabinets.

Options include stock, semi-custom, and custom cabinets, each offering varying levels of personalization and cost.

The Brandon, MS homeowners’ guide to cabinet contracting

From average costs to expert advice, get all the answers you need to get your job done.