"Adam was fantastic. Clean lines down our long driveway. Really enhances the entire property. Provided a quote and stuck to it. Showed up on time and stuck to schedule. Definitely recommend!"
"We are remodeling home originally built in 1971. This home had two areas of change, including the front porch of the home and an enclosed sunroom on the back of the home. The bricked up team was able to clean and reuse brick we salvaged from other areas of the home, creating a seamless look. The bid process was easy, we received a well written quote in a timely fashion, scheduling was a breeze communication and craftsmanship have been great. Give him a shout folks."
"Matt is a true professional, listens attentively, provides valuable feedback, and maintains good communication. Quality of work speaks for itself, but only time can tell. He does have the equipment to get the job done and did a good job to clean up after his work. He scheduled for two days, but got it done in one for the same price."
"He removed and replaced a front sidewalk and did a great job! Very fast service too. He sent me pictures, since I was out of town. I would highly recommend."
"One Contracting did my complete job for an in ground pool install. They dug my pool, installed plumbing for the bathroom, and laid a large concrete patio around the pool. Easy to work with and allowed me to make changes/additions along the way and did a great job."
"Mr. Anderson, the owner, is very efficient. He gave me an estimate for replacing/repairing some siding on a third story dormer window and I was able to schedule the work for the following week. On the day of services, he was efficient, on ti e, polite, went right to work and completed the job within hours! He cleaned up any mess as well! I would highly recommend his restoration and building services!"
By grading and compacting the base soil, ensuring proper drainage and stability.
In terms of durability, concrete driveways can last more than 50 years when properly maintained, compared to the typical 30 years for an asphalt driveway. However, the durability depends on the climate, base material and thickness, and thickness of the concrete or asphalt used. The longevity of concrete or asphalt driveways also depends on how well it’s maintained and the amount of wear and tear it endures.
Yes, with colored finishes and decorative stamping for a personalized touch.
It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting.
Regular sealing, crack filling, and professional inspections help extend pavement lifespan and prevent costly repairs.
The Wellsville, MO homeowners’ guide to asphalt driveway services
From average costs to expert advice, get all the answers you need to get your job done.
Learn how to find a top-rated asphalt driveway sealing pro by checking credentials and asking the right questions to ensure your pavement is protected.
Adding a new asphalt driveway to your home can boost its overall appearance and give homeowners a nice ROI down the line. But how long do asphalt driveways last, and what can you do to maximize their lifespans? Read this guide to find out.