Top-rated asphalt driveway pros.

Best asphalt driveway pros near Hallsville, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Hallsville, MO?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Hallsville - Updated Nov 2026

Avatar for Firebird Concrete & Pools, Inc.
Firebird Concrete & Pools, Inc.
4.6(
22
)
Concrete Driveways - Install

Serving Hallsville, MO and surrounding areas

Approved

In business since 2010

Free estimates

Customers say: Terrific value

"Dustin and his wife were such nice people. He called me immediately after I put in the request and gave me a quote. We set the date for him to come look a the site. He was great with communicating with me every step of the way. Even double checked that I was happy with the size of the patio and whether a end needed to be softened. I had to call him back when he was still down the street because the dog had already (accidentally) gotten on it and he came right back and fixed it! Life saver! I highly recommend Firebird!"
Ashlar Slate stamp - candy apple red
Ashlar Slate stamp
Slate stamp - before being sealed
Stamp - before being sealed
During project

+37

Response time1 day
Recommended by90%of homeowners
COMO Construction and Landscaping, LLC
3.8(
36
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Hallsville, MO and surrounding areas

Approved

In business since 2003

Free estimates

Credit card accepted

"Matt and his team completed a major landscaping project in my backyard and it only took them two days to complete. They poured concrete to extend my back patio on Day #1, and laid sod on my entire backyard on Day #2. Fine Finish was professional, efficient, and did quality work. I would recommend them to anyone needing landscaping."
Response time1 day
Recommended by86%of homeowners
Avatar for Continental Siding Supply
Continental Siding Supply
4.8(
605
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Hallsville, MO and surrounding areas

In business since 1982

Free estimates

Emergency services offered

"I’m very happy with the installation! And my biggest relief is I don’t ever have to paint again! We also just have piece of mind that if we ever sell this home, the warranty transfers to the new owners. We would and have recommended continental to a few of our friends."
Before and After
Classic Meets Modern Farmhouse
Classic Meets Modern Farmhouse
Classic Meets Modern Farmhouse
Classic Meets Modern Farmhouse

+28

Recommended by97%of homeowners
...
Showing 1-10 of 94
Asphalt Driveways FAQs, answered by experts

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

An ideal driveway gradient is between 2% and 5%. Anything lower than 1% or higher than 15% can cause problems for your car or property. A driveway with less than a 1% slope increases your likelihood of flooding and water damage, while a driveway with a 15% grade or higher can be too steep for safe traveling.

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

Yes, you can retrofit an existing driveway, but this usually involves cutting grooves into the driveway, installing the heating elements, then sealing them. While this is much less expensive than typical heated driveway systems, the final appearance could be diminished. Speak with a driveway paving company to confirm which design method is best for you.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

The Hallsville, MO homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.