Top-rated basement remodelers.

Get matched with top basement remodelers in Warrenton, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Warrenton, MO?

Select your specific project to find the pro for you.

TRUSTED BY WARRENTON, MO HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon15
    Verified basement remodels reviews

Find Basement remodelers in Warrenton

Avatar for MH Contracting LLC
MH Contracting LLC
4.9(
15
)
Basement - Remodel

Serving Warrenton, MO and surrounding areas

Approved

In business since 2012

Free estimates

Warranties offered

"Mike and his team are absolutely wonderful to work with. We moved into our new home in October of 2020 and our basement was completely unfinished at the time. We worked with Mike to create plans to add a bedroom, office, laundry room, family room, and an additional bathroom. During the project, we were so happy with Mike and his team that we asked if he would be able to help us with the upstairs as well. For the upstairs, MH contracting removed a wall that separated the kitchen and living room, removed carpet in the bedrooms, updated two bathrooms with new tile and vanities, along with installing new vinyl plank flooring throughout the upstairs. The wall was removed flawlessly and you would never know that there was a wall there. For the basement, they stabilized the stairs, installed completely new framing, fixed plumbing components that were not up to code from the previous owner, fully insulated and dry walled, painted, all new electrical and panel upgrades, added an egress window, and laid new vinyl plank flooring. The basement is now completely finished with proper permits and fully passed inspections. Mike’s communication was great throughout the entire project and all of his team members were very polite, clean, and helpful. He kept us up to date on any material delays throughout the pandemic and set proper expectations. There were material delays that were out of Mike’s control so the projects took about four and a half months to complete but they were a pleasure to work with the entire time. We would absolutely recommend Mike and his team to any of our friends and family for any work you’re looking to have done to your home or business."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+54

3 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Terbrock Remodeling & Construction
Terbrock Remodeling & Construction
4.4(
77
)
Basement - Remodel

Serving Warrenton, MO and surrounding areas

Approved

In business since 1950

Free estimates

Warranties offered

"Tom and team did a basement remodel for me about 13 years ago, including adding a bathroom. Subsequent projects were window replacement for the entire house, and new roof/front porch. We received numerous compliments about the roof and front porch as it improved the entire look of the house from the street. He also replaced my concrete driveway to make it double wide. The most recent job was updating the columns wrapped around the porch. They were wrapped in aluminum which looked great but seemed like squirrels like to chew on them. Went with a different material this time around."
Kitchen Transformation
Anchor Bend Estates
Anchor Bend Estates
Anchor Bend Estates
Additional Photos

+20

Response rate100%
1 neighbors recently requested a quote
Recommended by89%of homeowners
Avatar for In 'N Out Construction LLC
In 'N Out Construction LLC
5.0(
10
)
Basement - Remodel

Serving Warrenton, MO and surrounding areas

Approved

In business since 2024

Free estimates

Offers commercial services

"In â N Out Construction was very professional. They did the job in a timely manner and had all of the tools they needed for this job. They were also very tidy. They left the space cleaner than when they started. The door that I bought was a little bigger than the previous one but Jose was able to retrofit to the original opening. I would definitely have In â N Out Construction back to my house to do work."
fridge area
fridge area
work in progress
stove area
before job

+4

Response time12 hrs
Recommended by100%of homeowners
Avatar for LST Builders
LST Builders
New to Angi
Basement - Remodel

Serving Warrenton, MO and surrounding areas

Approved

Emergency services offered

I am a construction professional with a strong background in both residential and light commercial building, specializing in remodels and new construction projects. My experience covers everything from small interior renovations to full ground-up builds, giving me a well-rounded understanding of the entire construction process from start to finish.\n\nI have successfully completed a wide range of projects, including kitchen and bathroom remodels, full home renovations, additions, and new construction builds. Whether transforming an existing space or starting from the ground up, I take pride in delivering high-quality workmanship with attention to detail and a focus on long-term durability.\n\nMy approach is hands-on and organized. I manage projects by keeping schedules tight, coordinating trades efficiently, and maintaining clear communication with

...
Showing 1-10 of 103
Basement Remodel questions, answered by experts

Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Adding an extension or addition to your home costs more than a loft conversion in all but the rarest cases where the home's structural integrity is lacking. Because a home addition requires a new foundation section or significant structural upgrades to handle a cantilevered portion, the cost compared to almost any loft conversion is significantly greater for the same square footage.

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

Yes, you can add a door to your basement—it might even be required, depending on building codes in your area and whether or not you’re using the basement as a bedroom. A basement contractor can give you some advice on installation and help you add a door to your basement.

The Warrenton, MO homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.