Top-rated cabinet contractors.

Get matched with top cabinet contractors in Pevely, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your cabinet contracting project in Pevely, MO?

Select your specific project to find the pro for you.

TRUSTED BY PEVELY, MO HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon25
    Verified cabinet contracting reviews

Find Cabinet contractors in Pevely

Cabinet Refacing by Design
4.7(
77
)
Cabinets - Reface

Serving Pevely, MO and surrounding areas

Approved

In business since 1993

Free estimates

Warranties offered

"We updated old thermofoil cabinets with a shaker style thermofoil doors, crown molding and a new backsplash. Rick and his installer take great care and pride in their work. We did not want to go through a major renovation and liked our existing Silestone countertops. Rick made it look like a new kitchen without the strain of a major renovation."
 Before
 1
 After
Smith
Project Photos 02

+35

Response time6 hrs
Recommended by93%of homeowners
Avatar for Matt's General Home Improvements
Matt's General Home Improvements
5.0(
22
)
Cabinets - InstallCabinets - RefinishCabinets - Repair

Serving Pevely, MO and surrounding areas

Approved

In business since 2020

Free estimates

Emergency services offered

"Very prompt ,honest and up front about cost, very personable ,did a great job replacing outlets installing an outdoor security light , figuring out a mystery leak that plagued us for years we will definitely have him come back for the numerous other things we need fixed!"
Response time8 hrs
Recommended by85%of homeowners
Avatar for VMK Remodeling
VMK Remodeling
4.2(
19
)
Cabinets - InstallCabinets - RefaceCabinets - Refinish+3 more

Serving Pevely, MO and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Warranties offered

"Vinc came and gave estimate and was very professional. The original job turned into a bigger job and he handled that very well. He was upfront with us on any changes in cost and completed the project professionally and skillfully."
Response time2 days
Response rate90%
33 neighbors recently requested a quote
...
Showing 1-10 of 122
Cabinet Contractors questions, answered by experts

Most installations take 1-3 days, depending on customization and venting setup.

Most assemblies take 1-3 hours, but larger units or those requiring wall mounting may take longer.

Solid wood is the most common material for cabinet bases. It’s a popular choice because it’s durable and will hold up over time. Oak, maple, cherry, hickory, and pine are all types of solid wood that can be used to build cabinet bases. Other options include plywood, medium-density fiberboard, and other types of manufactured lumber, but they need to be sealed properly to avoid swelling, separating, and delamination from moisture.

Late summer or early fall are two popular times to upgrade kitchen cabinets. With the holidays right around the corner, this gives you spillover time in case your renovation project takes longer than anticipated. Then you get to host and show off your new kitchen when company comes.

The 1/3 rule is a design guideline used by interior designers and cabinet installers to select appropriately sized pulls for cabinets and drawers. The rule suggests that for a balanced and cohesive look, a cabinet pull should be approximately one-third the height of the cabinet door or one-third the width of the drawer face. This guideline helps create a symmetrical appearance because the human eye tends to follow the length of the pull across the cabinet face.

While the 1/3 rule is a helpful starting point, it is not the only option. If a measurement falls between available pull sizes, it's generally best to size up. For an ultra-contemporary aesthetic, you can also opt for full-width pulls that span the entire drawer.

The Pevely, MO homeowners’ guide to cabinet contracting

From average costs to expert advice, get all the answers you need to get your job done.