Top-rated excavation pros.

Get matched with top excavation pros in Naylor, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Naylor, MO?

Select your specific project to find the pro for you.

Find Excavation pros in Naylor

Avatar for Rymer Dozer & Backhoe Service, Inc.
Rymer Dozer & Backhoe Service, Inc.
5.0(
2
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+1 more

Serving Naylor, MO and surrounding areas

Approved

In business since 2004

Free estimates

Credit card accepted

"They came and dug a new leach line that had been crushed from previous work done on the land. They were very professional and worked very hard to complete the job. It was not an easy task due to an abundance amount of very large rocks where we needed the new leach line. But they worked hard and made it happen. Very pleased with their work and effort from Wappapello, MO."
Excavated basement
Excavated basement
Excavated basement
Excavated basement
Sewer system

+2

Response time6 hrs
Response rate98%
Recommended by100%of homeowners
Showing 1-10 of 24
Excavating questions, answered by experts

The best type of soil to build on is a mixture of sand and clay, known as loam soil. Loam soil has the best combination of these soil types to build a foundation on. The clay particles help with water retention, so it won’t erode like sandy soil might, and the sandy particles help with drainage, so you won’t see unsafe soil expansion or have an increased risk of leaks from water sitting against your foundation.

Yes, chipmunk holes may have two or more entrances. Chipmunks can create an entire network of burrows. Having multiple entrances makes it easier for them when trying to escape from a predator, such as a snake, or if an entrance collapses due to flooding. Each entrance leads to the nesting chamber underground, which is where the chipmunk spends the majority of its time sleeping.

Chipmunks dig their burrows about three feet deep and up to 30 feet long. The entrances can be two inches wide or more. Chipmunks are fiercely protective of their burrows and use them to protect the nuts and seeds they gather for the long winters.

It takes one hour to dig a 10-foot trench by hand. Use a trenching shovel with a sharp tip and a long head. Plan for more time if your soil is heavy or rocky. Consider renting a trencher if you’re digging a long or deep trench or if you have challenging soil or terrain. 

Hard soil could be a sign of overly dry dirt, either from poor drainage or drought. It's important to test the nutrient levels, density, and drainage capacity of your soil to see if it's absorbing water properly. Begin by adding a light layer of water and observing how long the soil retains moisture. If you experience a good deal of runoff, you may need to aerate your lawn, apply a wetting agent, or hire a professional for a closer look.

The Naylor, MO homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.