Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Imperial, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Imperial, MO?

Select your specific project to find the pro for you.

TRUSTED BY IMPERIAL, MO HOMEOWNERS

  • Average homeowner rating star icon4
    Average homeowner rating
  • Verified reviews icon126
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Imperial

Avatar for Two Men And A Spa Dolly
Two Men And A Spa Dolly
4.1(
14
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Imperial, MO and surrounding areas

In business since 2003

Credit card accepted

"I just had a three man crew move my hut tub today. They showed up on time, loaded everything including the cover, stairs and cover lift, and within minutes they were moving to the new house. They were very professional and friendly, and set up the hot tub exactly how I wanted it. The whole process was less than an hour, not including drive time. The pricing was exactly as quoted. I would highly recommend Two Men and a Spa Dolly."
Recommended by91%of homeowners
Showing 1-10 of 32
Install Above Ground Pools questions, answered by experts

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Because they are smaller than an average-sized swimming pool, building a plunge pool is less costly than a traditional pool. In-ground swimming pools cost about $67,000, while plunge pools cost around $20,000. You won’t have as much room to swim in, but the smaller size means you spend less on land excavation, materials, and hourly labor rates.

A stock tank pool is far cheaper than an in-ground pool. Installing an inground pool costs $55,000 on average, while a stock tank pool costs around $945 to install.

The best temperature to paint a pool deck is between 50 and 90 degrees Fahrenheit, because many paints and sealers require temperatures warm enough for the chemical reaction to take place for proper curing. The paint should not be allowed to freeze, and temperatures above 90 degrees can cause the paint to dry too quickly, also preventing the chemical reaction from following through to completion.

It’s not ideal to swim in a cloud pool, as it can be a sign of algae, bacteria, or calcium buildup as well as chlorine, pH, or alkalinity imbalances. It is best to avoid cloudy water in pools until you determine the cause of the color change.

The Imperial, MO homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.